Everything You Need to Know About the Carpentry Trade

The National Low-Carbon Strategy (SNBC) calls for the energy-efficient renovation of 500,000 homes per year through 2030, then 900,000 through 2050 (source). In addition to insulating roofs and walls, double-glazed windows reduce heat loss by 15% (source). This task, along with installing hardwood floors, falls under the scope of carpentry. However, this trade faces significant recruitment challenges: 80% according to France Travail (formerly Pôle Emploi) (source). What training programs and job opportunities are available if you decide to become a carpenter?

1. What are the main responsibilities of a carpenter?

The carpenter works on the interior of a building by crafting furniture, floors, or structures that connect rooms. These may include doors, windows or stairs for kitchens, living rooms, bedrooms, patios, or pergolas (source).

To create the custom piece, he takes the room’s measurements and transfers them to a construction plan. After selecting the material that best suits the building’s style, he fabricates the interior element using precision machine tools (source): 

  • table saw;
  • wood-turning lathe;
  • jointer-planer;
  • wood-fired stoves.

The structures are transported from the workshop to the construction site, where their components are assembled and treated with various finishes (varnish, lacquer, etc.). The carpenter also performs insulation and waterproofing of the building, as well as major structural in collaboration with a roofer or furniture restoration (source).

What materials does a carpenter work with?

The wood remains the material most widely used by professionals. Not only is it sturdy and insulating, but certain finishes (varnish, oil, wax) also make it resistant to dust.

However, carpenters use other materials such as PVC or aluminum. PVC is more economical than wood, but it has a more neutral appearance, and temperature changes can cause it to warp due to expansion. As a result, it is less durable than wood that has been properly treated (chemically or thermally) against moisture or pests. The thinness of aluminum makes it suitable for assembling frames for large picture windows. However, it does not provide good thermal insulation.

Good to Know: What are the differences between a carpenter and a cabinetmaker?

The cabinetmaker and the carpenter both work with wood to fit out the interior of a building. However, their working methods differ in several ways.

 

Carpenter

Cabinetmaker

Production

Structural and functional components, whether mass-produced or custom-made: doors, windows, frames, staircases, closets, etc.

Custom decorative furniture: tables, chairs, cabinets, bookcases, etc. 

Materials Used

Sturdy construction woods: pine, oak, fir, beech

Fine and precious woods for marquetry: mahogany, walnut, maple, and exotic woods

Techniques

  • Mortise and Tenon
  • dovetail joints
  • Special-Purpose Machines
  • Sculpture
  • Veneer or marquetry
  • hand polishing
  • Traditional Tools

Finishes

Simple, sturdy, and functional design

An elegant, decorative finish

Work Environment

Workshop with heavy machinery

A smaller, quieter workshop

2. What skills does a carpenter have in the shop or on a job site?

A mastery of geometry and mathematics is essential for drawing up plans for partitions or for installing hardwood floors. This precision is also necessary when handling tools to prevent accidents, especially when working with machinery. Understanding the physical properties of materials allows them to be worked with precision and aesthetic appeal. Their technique, as well as industrial production, must not stifle their creativity so as to meet the wishes of the client.

In addition to his skill, a self-employed carpenter would be well advised to demonstrate versatility in his work. This allows him to work on a variety of types of projects and collaborate with various construction professionals : masons, carpenters, plasterers, site supervisors, etc. It’s all about listening, adaptability, and coordination.

3. Becoming a Carpenter: What Are the Required Degrees and Career Prospects?

Carpentry isn't limited to just one trade. There are several specialties depending on the materials or types of projects you wish to undertake. As a craftsman, you’ll pursue short vocational programs, but there’s nothing stopping you from changing careers through adult education programs.

Training Programs to Become a Carpenter

There are as many educational programs as there are specializations in carpentry. However, post-middle school degrees can be categorized into three main levels:

  • CAP (Certificate of Professional Competency) in carpentry;
  • Vocational Diploma (BP) in Technical Studies;
  • BTS (two years of post-high school education).

The specializations correspond to the materials the future apprentice will work with (wood or aluminum) or to specific techniques. Thus, a carpenter may be: 

  • Interior Designer or installer : He manufactures and installs woodwork components on-site, ensuring they are properly sealed.
  • Manufacturer : They work in the workshop to produce the items. This requires in-depth knowledge of the tools and processes used at their workstation.
  • Marquetry Artist : He embellishes wooden panels with ornamental designs made from precious materials.
  • etc.

For adults seeking a career change, training courses eligible for CPF funding are available at your AFPA or France Travail office. These programs allow you to acquire, in just a few months, skills recognized at Professional Level 3 (CAP/BEP).

Check out the various career profiles on Onisep

A Carpenter's Salary Based on Experience

As a construction worker, the gross monthly salary of a with no experience in 2024 is 1,766.92 €. If they advance through the ranks to the level of project manager or team leader, the experienced carpenter can earn 2,415 € gross per month. These figures vary depending on the companies or regions where the woodworker is employed: the Île-de-France region offers higher wages than in the provinces (source).

Income tax is withheld from this salary at a rate of 4.5% (source). However, salaried carpenters are eligible for several benefits to boost their take-home pay , such as a 13th-month bonus, overtime pay, and company health insurance.

Career Opportunities and Advancement in Carpentry

According to Onisep, 90% of young carpenters find jobs in small businesses upon completing their studies. Construction/renovation companies and industrial manufacturing firms also hire these recent graduates. Permanent contracts are offered as employees gain more experience and qualifications.

Thanks to his experience, a salaried carpenter can be promoted to the position of workshop manageror foreman , or team leader. The gross salary ranges from 2,500 to 3,800 euros (source). By completing training to acquire managerial skills, it is possible to move into a position as a business owner.

Carpenters who want to start their ownself-employment hope to earn higher incomes (between 2,300 and 5,000 euros (source)). This is possible provided they have a solid grasp of marketing and are willing to take on multiple responsibilities (project management, administrative tasks, sales, etc.).

Our experts in supporting business leaders are here to help you

4. How are new technologies improving the carpentry industry?

The carpentry trade has existed for centuries, but the development of new digital technologies is making products more efficient and durable. CNC machines cut materials with unmatched precision. computer-aided design software (CAD), similar to BIM, allows customers to validate the product before it is manufactured using a virtual model. smart glass changes its transparency depending on the temperature or lighting in the room.

Wood is also suitable for 3D printing thanks to specific processes such as filament extrusion or the powder bed process. For outdoor projects, composite wood is more resistant to wear and tear, stains, and moisture than traditional wood. 

Among these innovations is theconstruction site tracking app enables carpenters to perform several tasks in real time: 

  • Manage your schedule.
  • Coordinate with other trades using instant messaging.
  • Report your hours.
  • Access the plans and other important construction site documents.
  • etc.

Using this connected tool guarantees considerable time savings in managing various tasks. Tradespeople become more efficient and save resources thanks to better control over deadlines and costs, as noted by the CEO of CMT Industriepoints out. Techtime includes all the features you need to improve the quality of your projects. Don’t wait any longer—install it on your computer or mobile device today.

A carpenter is a craftsman who works with wood to create various pieces for your interior design. They also work with other materials that are more economical or offer comparable insulation, such as PVC or aluminum. This is a profession with a bright future, given the many renovation projects in the construction industry. Whether you’re an employee or a self-employed contractor, save time on administrative tasks so you can reinvest that time in creating your work. Schedule an appointment to sign up for our construction site tracking app.