Structural steel erector: which management software should you use?

The structural steel erector assembles, fixes and repairs the components of steel structures. These are used to build steel frames and roof structures, industrial buildings, blocks of flats, factories, hangars, commercial buildings, bridges and more. Discover the steel erector’s job profile and the software Techtime offers to help you increase your productivity.

What does a structural steel erector do?

Structural steel erectors generally work for construction and civil engineering companies or for metalworking firms. On a worksite, they may work alongside other construction professionals such as roofers, joiners or industrial boilermakers.

The structural steel erector’s tasks

The steel erector’s tasks are many. They may carry out:

  • cladding;
  • squaring;
  • checking and measuring steel plates;
  • designing a steel structure that suits the customer;
  • assembling and building metal structures;
  • insulating and waterproofing installations: roofs, structures, terraces, gutters, etc.;
  • creating openings for windows or doors;
  • renovating and restructuring existing structures.

In the machining workshop, they fabricate metal structures of various sizes. They can also assemble parts directly on the worksite and then install them using lifting equipment.

What skills are required?

The steel erector’s trade calls for a good many qualities and skills to carry out the large-scale jobs typical of this profession.

Technical skills

The steel erector must have technical skills : welding, cutting techniques, marking out and bolting. They must have a thorough knowledge of the materials used, their characteristics and qualities. Finally, they must be able to read plans correctly, interpret them and carry out calculations based on the documents.

Precision

The steel erector must show precision and concentration to read and interpret the drawings of the architect or design office. They must be meticulous and attentive: the slightest manufacturing defect can cause a structure to collapse.

Good interpersonal skills

The steel erector always works in a team, so they need excellent interpersonal skills.

Safety

Steel erection is a high-risk trade: knowledge of and compliance with safety standards are therefore required.

Good physical fitness

The steel erector lifts heavy loads and often works on scaffolding at height. They must therefore be dexterous and physically resilient.

What are the advantages and disadvantages of being a structural steel erector?

Versatile and highly technical, the steel erector’s trade is exciting and essential on a worksite. But it also has some drawbacks.

The advantages of the trade

Above all, the trade is stimulating: it lets you work in varied working environments and in a sector that is constantly evolving thanks to ongoing technological and digital advances.

Above all, the profession offers many job opportunities, as well as good prospects for the future and for career progression, thanks in part to sustainability and energy performance issues.

The disadvantages

The main drawback: it is a very physical and tiring job, since it involves carrying and handling heavy components throughout the day.

Working conditions can also be tough. The steel erector has to work at height, sometimes in uncomfortable conditions, and is exposed to the weather, such as snow, rain or extreme heat.

Finally, as worksites are sometimes far from home, the steel erector has to travel regularly across the department, the region or even the country.

Steel erector assembling a steel structure

How do you become a structural steel erector in France?

Several French qualifications, some of which can be started after Year 10 (3e), can lead to becoming a steel erector:

  • CAP serrurier métallier (locksmith-metalworker vocational certificate);
  • CAP réalisation industrielle en chaudronnerie ou soudage (industrial boilermaking or welding certificate);
  • Bac pro ouvrages du bâtiment : métallerie (vocational baccalaureate in building metalwork);
  • Bac pro technicien en chaudronnerie industrielle (vocational baccalaureate, industrial boilermaking technician);
  • BP métallier (professional metalworker certificate);
  • MC technicien en soudage (welding technician additional qualification);
  • BTS constructions métalliques (two-year higher diploma in steel construction);
  • BTS conception et réalisation en chaudronnerie industrielle (two-year higher diploma in industrial boilermaking design and production).

How much does a structural steel erector earn in France?

The average salary of a steel erector in France is between €2,000 and €2,250 gross per month.

Pay increases over the course of a career and depends on several factors such as experience, the company, responsibilities and geographical location.

A beginner steel erector generally earns the French minimum wage (SMIC), i.e. around €1,700 gross.

A more experienced worker at the end of their career can expect to earn around €3,000 gross per month.

How does Techtime help structural steel erectors?

Technician in a steel fabrication workshop at a machine control panel

As a structural steel erector, Techtime lets you manage your missions and worksites remotely and in real time, and optimise your organisation.

Techtime consists of two pieces of software tailored to each user:

  • a web app for the business owner or works manager (for use on a computer);
  • a mobile app for steel erectors working in the field (on their Android phone or iPhone).

As a professional, management software for steel erectors lets you spend more time on your business and on growing your company.

Techtime offers several features to support you simply every day:

  • schedule and time management: your schedule is synchronised in real time, and you have an overview of missions completed and still to do;
  • tool management software: you can list all the equipment needed for each worksite;
  • vehicle management software: you know where your vehicles are, who is driving them and for which missions;
  • worksite reporting software: with a news feed in the form of a timeline, Techtime provides precise activity reporting throughout the day so you can easily anticipate every need.
app.techtime.fr/planning
Weekly schedule of a steel framing company in Techtime: Steel structure assembly, Steel post installation, I-beam assembly… with the assigned teams and vehicles
Schedule of a steel erector in the Techtime mobile app: Anti-corrosion treatment, Weld repair…

Want to try Techtime on your worksites?

Techtime offers a wide range of customisation options. Our customers are increasingly looking for configuration options, such as links between Techtime and your CAD software, for example. And we always do our best to meet your needs!

Management software for steel erectors improves results

80%

Faster

Simplified planning

65%

More efficient

Better tracking

66%

Higher performance

Growing productivity

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes