Management software for tilers

Your worksites and missions

Management software for tilers is essential. After all, worksite management is a crucial step for building professionals.

A digital solution simply makes your work easier in the field and in the office. You centralise all your information in one place, and plan and handle the unexpected more responsively.

Planning ahead to stay organised greatly improves your productivity. With Techtime, your productivity is optimal. In other words, you benefit from:

  • more effective communication between your teams
  • better task organisation
  • simplified management of customer and supplier documents
  • real-time tracking of all your activities

The app for site supervisors and tilers

The Techtime app is a perfect answer to the challenges of the tiling trade.
Techtime offers two pieces of software designed for each role and setting:

  • A web app for the manager (usable on Mac / PC and tablet)
  • A mobile app for tilers working on the customer’s site (available on Android phones and iPhone)
app.techtime.fr/chantiers
Worksite diagram of a tiler in Techtime: Les Vergers residence – tiling package, Shop tiling, Novalis office floors

The tiler’s trade: missions and tasks

The tiler is a specialist in tiles and mosaics, porcelain stoneware, slate, marble and ceramics. They lay tiles according to the tiling plan or layout and cut tiles as needed.

The tiler or tile and mosaic layer arrives on the worksite to carry out the finishing work, after the other construction technicians. In other words, they work alongside the plumber, the electrician and the painter.

During a mission, their work is not limited to simply laying coverings. First and foremost they carry out surface preparation: examining the plans and the surfaces to be tiled, measuring and marking them out. Next, they prepare walls and floors by removing old tiles, glue and adhesive, and filling holes and cracks. They also handle the finishing and clean the surfaces at the end of the covering work.

Finally, they take care of insulation and above all waterproofing: their work must withstand moisture.

They can work for themselves as a self-employed tiler, for a tiling/renovation company or for a construction company.

A tiler’s tasks are varied:

  • Providing estimates and quotes to customers (for example, the number of tiles and quantities of materials needed, and the installation time and costs)
  • Pouring screed, fitting skirting boards…
  • Laying granolithic, terrazzo, cement or similar floor coverings
  • Shaping and laying a wide variety of materials: glazed or porcelain stoneware, earthenware, slate, marble, terracotta, glass paste, enamelled lava

The tiler works alone or in a team in all kinds of settings: renovating houses, buildings, laboratories or hospitals, landscaping gardens, building swimming pools, tiling public spaces, paving.

Tiler adjusting a spacer between two wall tiles

What qualities and attributes does a tiler need?

The tiler is versatile, and customers can rely on their many skills for high-quality work.

Attention to detail

In their trade, the tiler has an unfailing eye for detail. They work precisely throughout their tasks, especially when cutting and gluing tiles. To deliver high-quality work to customers, the tiler shows patience, for example when making sure that:

  • The gaps between tiles are sealed
  • The tiles are correctly aligned and spaced
  • In a mosaic, the ceramic pieces are perfectly symmetrical
  • Tile grouting, cleaning and removing excess grout

Their attention to detail also shows at the end of the job, when they check the work done.

Adaptability

Bathroom, kitchen, façade, terrace… the tiler covers walls and floors with ceramic tiles but also marble, stoneware and porcelain. A wide range of materials they must know inside out to adapt to each customer’s needs and profile (taste, budget…).

They also work in different environments (outdoors, indoors in a private home, on a building renovation worksite, in a noisy environment, in bad weather…).

Artistic flair

Like many craft trades, tiling calls for a well-developed artistic sense. The tiler plays a key role in decoration: they give the room or surface its identity. Depending on the customer’s wishes, they lay tiles straight or diagonally, choose from an impressive range of materials and colours, and use friezes, mosaics…

The tiler also defines the type of joint by its width and colour to achieve a harmonious finish.

Team spirit

On a worksite, they are constantly in contact with other construction professionals. They work on worksites and must coordinate with other building trades such as bricklayers or painters. So they need good communication skills to make the most of their time: collaboration is the watchword!

Calculations

Calculations hold no secrets for the tiler. Every day, they are asked to calculate the amount of tiling needed to cover a surface, the budget and so on. They must also take openings (doors, windows…) into account and deduct them in their calculations. This requires good maths skills.

Techtime: software designed for you, tilers

Tiler laying a tile on tile adhesive

Tile with peace of mind,
Techtime takes care of the rest!

Tool management software for tilers

Good management of work tools is essential in construction.

Pincers, angle grinder, tile cutter, knee pads, manual tile cutters, saws, trowels, squeegee… A tiler’s tools are varied, and it is easy to lose track or forget one. Not to mention that tiles are very fragile, so anyone can break materials on a job. With your management software for tilers you stay in control of the tools for each tradesperson. Techtime lets you create libraries for your supply stocks.

For example, you can sort them:

  • by type of covering: earthenware, ceramic tiles, marble, granite, stone, slate, terracotta, porcelain stoneware…
  • by type of product: damp-proofing, waterproofing, insulation…
  • by tool: grouting mortar, sealant, tile cutter, grinder…

For the works manager: you have an equipment catalogue that you can link to your activities. If a tool is missing, you see it straight away. Your technicians know in real time which supplies to take with them.

For technicians in the field: there is less rushing to work out what to take and which resources are still available, since everyone knows the equipment list to take with them to mission and worksite locations.

These features benefit both the works supervisor and the tradesperson!

Attendance sheet management software

For your missions and worksites, your tradespeople’s working time is a very important figure. All the more so in your trade, where time spent and installation costs are key to staying within the customer’s budget.

With Techtime, your technicians can enter their attendance sheets directly in their mobile app. In a few seconds, they fill in the form with:

  • arrival and departure times
  • break time
  • overtime
  • absence and reason

The technician’s app syncs automatically with the site supervisor’s software, so the totals are calculated automatically! All you have to do is follow progress live.

With digital management of time sheets, you can compare the budget sold with the budget spent. By extension, you get better quote management and invoice management.

It is also important to know the labour cost of each task and sub-task to guarantee the profitability of each worksite.

Finally, you can rely on previous costs and completion times, which remain stored in the software. No more lost information!

Vehicle management software for tilers

A successful worksite depends on good management of equipment, including vehicles. Construction professionals need utility vehicles to transport and store their equipment safely. Larger worksites sometimes require more equipment, some of it quite bulky, such as an electric floor scraper.

Techtime has a vehicle management feature. You get an inventory of vehicles that lets you quickly see which one is available and book it or assign it to a mission.

app.techtime.fr/planning
Weekly schedule of a tiling company in Techtime: Wall tiling, Screed and levelling, Floor tiling… with the assigned teams and vehicles
Schedule of a tiler in the Techtime mobile app: Old tile removal, Broken tile replacement…

Photo app for tiling work

In your trade, a good analysis of the situation and meticulous preparation are as important as the laying itself.

Depending on how the work is progressing, you sometimes need a clearer view of a task or to see the progress of a mission for yourself. For the site supervisor, a photo is the best way to ensure quality control.

But that’s not all! For technicians, photos help them prepare better and assess the scale of the worksite or the layout of a room before going on site. The Techtime app has a “worksite photo” feature.

A technician can take worksite photos and link them to activities.

This feature can be particularly useful during:

  • Preparing the substrate for tiling
  • Dimensional calculations
  • Renovations, to assess the old tiling
  • Comparing planned and actual
  • After work by other trades (plumber, electrician…)

Everyone receives and centralises all the photos from the worksite in real time. You can also annotate them and send the photo back with comments.

Digitalising your business is essential to stand out in a highly competitive sector. To stay productive and make the most of your time, organisation is the watchword.

Choose management software for tilers like Techtime and boost your goals!

Our tilers are reaching their goals

72%

Faster

Simplified planning

67%

More efficient

Better tracking

75%

Higher performance

Growing productivity

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes