Comparison

InterFast or Techtime: pricing, features and differences

Techtime and InterFast schedule field missions and send them to technicians’ phones. InterFast is an all-in-one with quotes and invoices; Techtime focuses on organising field work and is priced per team. Here are the differences, with public prices checked on 22 November 2026.

app.techtime.fr/chantiers
Worksite chart in Techtime
In short

Techtime vs InterFast in short

InterFast is all-in-one software for building tradespeople and companies: quotes and invoices, e-invoicing, scheduling, job sheets and service reports, a mobile app, then maintenance and team management in the higher plans.

Techtime focuses on organising field work: scheduling of worksites and missions, a mobile app for technicians, reports, photos, customer signature and timesheets. It complements your quoting and invoicing software instead of replacing it, and lets several companies work on the same worksite.

Side by side

Techtime and InterFast at a glance

TechtimeInterFast
Who it’s forBuilding tradespeople and SMEs, landscapers, maintenance, architectsBuilding tradespeople and companies
Pricing modelOne flat rate for the whole teamA price per user
Entry price with scheduling and appFrom €55 excl. VAT / month for the whole team, up to 6 usersFrom €20 excl. VAT per user per month (€15 annually)
Price for 6 users, offline mode included€55 excl. VAT / month (€45.83 annually)€240 excl. VAT / month (€180 annually, Pro plan)
Price for 11 users, offline mode included€99 excl. VAT / month (€82.50 annually)€440 excl. VAT / month (€330 annually, Pro plan)
Free trial14 days, no credit card7 days, no credit card
Offline modeIncludedPro plan and above
Shared schedule and team managementIncludedPro plan and above
Worksite sharing between companiesIncluded, each company in its own accountNot described in the plans
Quotes and invoicesYour current software, linked via ZapierIncluded
Artificial intelligenceMCP connector coming soon as an optionCopilot assistant; MCP server in the Business plan
Public prices excl. VAT checked on 22 November 2026 on the official websites. At InterFast, offline mode and the shared schedule require the Pro plan (€40 excl. VAT per user per month, €30 annually).
Pricing

How much does each one cost for an 11-person team?

Take a company with a manager and 10 technicians: 11 users, with offline mode and a shared schedule.

Techtime: the MONTPARNASSE plan covers up to 11 users for €99 excl. VAT per month, or €82.50 per month billed annually (2 months free).

InterFast: offline mode, the shared schedule and team management require the Pro plan, at €40 excl. VAT per user per month (€30 annually), i.e. €440 excl. VAT per month for 11 users, or €330 annually. Quotes and invoices are included.

The result: even after adding quoting and invoicing software to Techtime, the gap remains large. For other tools on the market, see our field service management software comparison.

The differences

What Techtime does differently

A price per team, not per user

Hiring a technician? Within your plan’s limit, the bill does not change. See Techtime pricing.

You keep your invoicing software

Techtime handles field work and can exchange data with your other tools through Zapier. No need to migrate your quotes, invoices and customers.

Worksites shared between companies

Architect, main contractor and subcontractors follow the same worksite, each from their own account. See worksite sharing between companies.

14 days to test everything

The Techtime free trial lasts 14 days, with no credit card, on your real worksites and with your teams. See the Techtime free trial.

Choosing

Techtime or InterFast: which one is right for you?

Techtime is right for you if:

  • you already have quoting and invoicing software and don’t want to change it;
  • your team is growing and you don’t want to pay for every new user;
  • you want offline mode and a shared schedule without moving to a higher plan;
  • you work with other companies (architect, subcontractors) on the same worksites.

No invoicing software yet? Compare the total cost of Techtime plus the tool of your choice with an all-in-one, then judge in the field: try Techtime for 14 days with your technicians, or book a live demo.

Frequently asked questions

Your questions about Techtime and InterFast

What is the main difference between Techtime and InterFast?

InterFast is an all-in-one that includes quotes and invoices, priced per user. Techtime focuses on scheduling and field tracking, complements your invoicing software, is priced by team size and lets you share a worksite between companies.

Which is cheaper for an 11-person team?

At public prices checked on 22 November 2026, for 11 users with offline mode, Techtime costs €99 excl. VAT per month (€82.50 annually) and InterFast €440 excl. VAT per month (€330 annually) on the Pro plan. InterFast does include quotes and invoices.

Is InterFast free?

InterFast offers a free Basic plan focused on quotes, invoices and job sheets. Scheduling, the mobile app and offline mode require a paid plan. Techtime offers a full 14-day free trial with no credit card.

Does Techtime replace my quoting and invoicing software?

No. Techtime handles the operational organisation of worksites and missions and complements your quoting and invoicing software, with which it can exchange data through Zapier.

See also: Techtime vs Alobees, Techtime vs Praxedo and Techtime vs Organilog, plus our comparison of 8 field service management tools.

Sources: InterFast pricing page and Techtime pricing, checked on 22 November 2026. The names and trademarks mentioned belong to their owners. If you notice a change, write to hello@techtime.fr and we will update this comparison.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes