Management software for steel erectors

Organise workshop fabrication and erection worksites in a single schedule. Assign your teams, track hours spent and centralise drawings, photos and documents for each worksite with Techtime.

Techtime centralises scheduling, assignments, hours, equipment, photos and documents for your steel structure worksites. The office and erection teams work from the same up-to-date information.

Manage your steel structure worksites more simply

A steel structure goes through design, workshop fabrication, transport, then lifting and assembly on site. These stages involve different teams and have to follow on without downtime. Techtime helps you schedule each stage, assign the right people and keep a clear view of progress.

One schedule for the workshop and erection worksites

Between parts to fabricate, multi-day erection worksites and repair or maintenance jobs, a steel erection company’s schedule changes constantly. Techtime shows who is working, where and when.

  • schedule workshop activities and erection worksites;
  • assign the erectors, welders and team leaders involved;
  • reorganise the schedule when a delivery or lift is postponed;
  • see your teams’ availability and absences;
  • link the equipment and vehicle needed to each activity.

To go further, see our construction scheduling software and worksite equipment management.

From the workshop to lifting on site

Fabricating parts, preparing a delivery and erecting a structure need neither the same teams nor the same lead times. Techtime organises these activities in a single schedule while keeping each worksite’s own follow-up.

Follow-up at every stage of the worksite

Erection teams find the address, instructions, drawings and documents for the worksite. From their phones they record hours, photos and useful information, which the office sees straight away.

Track hours spent in the workshop and on site

Time spent on a steel structure is split between fabrication, transport and erection. Techtime tracks the hours worked by each team member and links them to the worksites concerned.

You can compare planned and actual time and easily find a worksite’s history. To centralise this tracking, see our timesheet management.

Lifts and deliveries to coordinate

A postponed lift or an earlier delivery can upset the whole week. Techtime lets you move activities and reassign teams when priorities change.

Drawings and documents before setting off

Drawings, calculations, safety instructions and worksite documents are grouped in the activity. The erection team finds them on their phones before and during assembly.

Progress photos

Photos taken on site are attached to the worksite and dated. The company keeps a usable history of the work carried out.

Time spent per worksite

Hours entered in Techtime show the time actually spent on each worksite, in the workshop and on site.

Equipment and vehicles

Welding sets, aerial platforms, tools or vehicles: link the equipment and vehicle needed to each activity so the team leaves with what it needs.

Very different worksites to organise

A steel structure company may run industrial buildings, storage structures, mezzanines and metalwork projects in the same period. Each project has its own lead times, teams and erection constraints.

Industrial and agricultural buildings

Framing, roofing and cladding involve several teams over several weeks. The schedule must show who works at which stage and on which date.

Steel erector assembling a steel structure

Metalwork and bespoke structures

Staircases, railings, walkways and mezzanines are fabricated in the workshop and then installed on site. Attaching drawings, photos and hours to each structure makes follow-up between workshop and worksite easier.

Working with the main contractor

Steel erectors often work for a main contractor or under an architect’s coordination. With worksite sharing between companies, everyone follows the same worksite from their own Techtime account.

Workshop fabrication, lifting or metalwork worksite:

Techtime helps you keep a clear view of your teams’ activity.

Manage your steel structure worksites from office to field

In the office: organise teams and priorities

app.techtime.fr/planning
Weekly schedule of a steel framing company in Techtime: Steel structure assembly, Steel post installation, I-beam assembly… with the assigned teams and vehicles
Schedule of a steel erector in the Techtime mobile app: Anti-corrosion treatment, Weld repair…

Techtime shows upcoming workshop activities and worksites, lets you assign team members and adapt the schedule when a lift or delivery changes date.

You keep an overview of ongoing worksites, from fabricating the parts to erecting the structure.

In the field: find and complete worksite information

Teams find their worksite information in the mobile app for iOS and Android, even without a signal thanks to offline mode, then send back hours, photos and documents.

The company keeps a centralised history of each worksite, to prepare the next stage of work or find the information on a structure already delivered.

What Techtime changes for a steel structure company

Scheduling

Organise workshop and erection worksites

Schedule fabrication, deliveries, lifts and jobs, then allocate teams according to the week’s priorities.

Field

Centralise each worksite’s information

Find drawings, instructions, photos, documents and equipment in one place to prepare an erection or a metalwork job.

Follow-up

Keep a clear view of the work done

Track hours spent, completed stages and information sent from the field to manage your worksites better.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes