Customer testimonial video

Techtime at CMT Industrie: organising the workshop and on-site jobs at client premises

Marc Walter, founder of CMT Industrie, a metal fabrication and industrial piping company, explains in 2 min 41 why he chose Techtime. Video in French with English subtitles, full transcript below.

In this video

In short

Key takeaways from the video

CMT Industrie is a metal fabrication, maintenance and industrial piping company founded by Marc Walter. It works for large local companies: pharmaceutical groups, industrial firms and manufacturers.

Its teams split their time between the workshop (cutting, bending, assembly, welding, painting) and on-site jobs at client premises (delivery, installation, maintenance). What Marc Walter needs: to know who does what, when, where and for whom, and to track time spent, budgets and deadlines.

He chose Techtime because the software is very easy to use and gives him the feedback from the field that he needs. The full story is told in the CMT Industrie case study.

Transcript

Video transcript

0:07 · Grégory Toucas, Idéematic agency — Hello! Today, with Techtime, we’re putting the spotlight on a craftsman, Marc Walter, from CMT Industrie. Let’s hit the road and find out who he is.

0:22 · Marc Walter — Hello, welcome to CMT Industrie: metal fabrication, maintenance and industrial piping. Metal fabrication is an industrial field covering all the work on sheet metal, tubes and various profiles for the industrial sector. We mainly work for large local companies: pharmaceutical groups, industrial firms, manufacturers.

0:45 · Marc Walter — The different stages are quite simple: we work on the client’s drawings, generally in 3D. Either we receive the client’s 3D model and develop all the sheet metal work, cutting, bending and custom work from their drawing, or we carry out our own design study in-house. Once the design is approved, we program the machines: cutting, plasma cutting, bending. Then it moves on to assembly, welding and painting, then delivery and installation at the client’s site.

1:19 · Marc Walter — My challenges are simple: we have on-site jobs, at our clients’ premises, and we have workshop work, with custom work, cutting, assembly, welding, and installation at clients’ sites.

1:36 · Marc Walter — My need, my problem, is this: who does what, when, where, at which client, why, for whom. Being able to manage the whole process side: time spent at the client’s site, time spent delivering, cutting, assembling, welding; keeping budgets and deadlines under control and, quite simply, managing staff.

2:09 · Marc Walter — My job is that of a craftsman and of a business manager. I need to free up as much time as possible for that. Techtime helps me a lot because it’s very easy to use. It lets me manage my jobs and get the feedback I need: I know who does what, when, where, for whom. It’s simply perfect.

English translation of the video, which is in French.

Find out more

Organise your jobs like CMT Industrie

Do you also organise jobs at client premises alongside workshop work? Discover our mission management software, mission scheduling and the option to add custom features.

All our videos are also on the Techtime YouTube channel.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes