Comparison

Obat or Techtime: pricing, features and differences

Obat and Techtime both serve construction professionals, but not for the same job. Obat is first and foremost quoting and invoicing software that adds scheduling in its Croissance plan; Techtime organises field work, worksites and missions, and is priced per team. Here are the differences, with public prices checked on 22 November 2026.

app.techtime.fr/chantiers
Worksite chart in Techtime
In short

Techtime vs Obat in short

Obat is quoting and invoicing software for construction tradespeople and companies: price libraries, unlimited quotes and invoices, e-invoicing and electronic signatures. Its Croissance plan adds purchasing, worksite profitability, scheduling, team workload planning and service reports.

Techtime organises both worksites and field missions: team scheduling, a mobile app for technicians, reports, photos, customer signature and timesheets. It complements your invoicing software, is priced per team and lets several companies work on the same worksite.

Side by side

Techtime and Obat at a glance

TechtimeObat
Who it’s forConstruction tradespeople and SMEs, landscapers, maintenance, architectsConstruction tradespeople and companies, from sole traders to 50 people
SpecialtyField organisation: scheduling, teams, worksite and mission trackingQuotes, invoices and business management
Pricing modelOne flat fee for the whole teamOne subscription per company, plus an optional licence per team member
Entry price with team schedulingFrom €55 excl. VAT / month for the whole team, up to 6 users€79 excl. VAT per month (€69 annually, Croissance plan)
Price for 6 users€55 excl. VAT / month (€45.83 annually)€179 excl. VAT / month (about €152 annually, Croissance + 5 licences)
Price for 11 users€99 excl. VAT / month (€82.50 annually)€279 excl. VAT / month (about €236 annually, Croissance + 10 licences)
Free trial14 days, no credit cardOffered, length not stated on the pricing page
Mobile appiOS and AndroidiOS and Android
Offline modeIncludedNot mentioned
Customer signatureIncluded on mobileUnlimited electronic signatures
Quotes and invoicesYour current software, connected via ZapierIncluded, the core of the software
Service reportsIncludedCroissance plan
Worksite sharing between companiesIncluded, each company in its own accountNot mentioned (subcontractor records)
Public prices excl. VAT checked on 22 November 2026 on the official websites (Obat: “TPE / PME” offer). Obat’s team scheduling and workload planning are in the Croissance plan; each team member to equip needs an optional user licence at €20 excl. VAT per month or €200 excl. VAT per year. Our calculations count the account holder’s access within the subscription. “Not mentioned”: the feature does not appear on the vendor’s pricing page.
Pricing

How much does each tool cost for an 11-person team?

Take a company with a manager and 10 technicians: 11 users, with team scheduling.

Techtime: the MONTPARNASSE plan covers up to 11 users for €99 excl. VAT per month, or €82.50 per month billed annually (2 months free).

Obat: team scheduling and workload planning are in the Croissance plan at €79 excl. VAT per month (€69 annually). Add one user licence per team member at €20 excl. VAT per month or €200 per year, i.e. €279 excl. VAT per month for 11 users, or about €236 per month annually. Quotes and invoices are included.

The result: to organise the same team, Techtime costs almost a third of the price. If you are mainly looking for quoting and invoicing software, the comparison rests on other criteria. To see other solutions on the market, read our field service management software comparison.

The differences

What Techtime does differently

A price per team, not per user

No licence to add for each team member: within your plan, the whole team has access to Techtime. See Techtime pricing.

Field work first

Team scheduling, mobile app, signed reports, photos and timesheets are included from the first plan. See the Techtime mobile app.

Worksites shared between companies

Architect, main contractor and subcontractors follow the same worksite, each from their own account. See worksite sharing between companies.

You keep your invoicing software

Techtime organises field work and can exchange data with your other tools via Zapier.

Choosing

Our take: Techtime or Obat, which should you choose?

Techtime is right for you if:

  • your priority is organising your teams and worksites day to day;
  • you already have quoting and invoicing software and don’t want to change it;
  • your team is growing and you don’t want to pay a licence per team member;
  • you work with other companies on the same worksites.

Is your priority pricing quotes and invoicing? That is Obat’s specialty. To organise field work, the simplest way is to judge for yourself: try Techtime for 14 days with your real worksites, or book a live demo.

Frequently asked questions

Your questions about Techtime and Obat

What is the main difference between Techtime and Obat?

Obat is first and foremost quoting and invoicing software for construction, which adds team scheduling and workload planning in its Croissance plan. Techtime is field organisation software: scheduling, mobile app, reports, photos and hours, priced per team, with worksite sharing between companies.

Which is cheaper for an 11-person team?

At public prices checked on 22 November 2026, for 11 users with team scheduling, Techtime costs €99 excl. VAT per month (€82.50 annually) and Obat about €279 excl. VAT per month (about €236 annually): Croissance plan plus 10 user licences. Obat does include quotes and invoices.

Does Obat handle team scheduling?

Yes, in its Croissance plan, which includes scheduling, team workload planning and service reports. The Pro plan offers a calendar.

Can I use Techtime alongside quoting software such as Obat?

Yes. Techtime does not produce quotes and invoices: it organises field work, and you keep your quoting and invoicing software. Techtime can exchange data with your other tools via Zapier; for guidance, book a live demo.

See also: Techtime vs Alobees, Techtime vs InterFast, Techtime vs Praxedo, Techtime vs Organilog and Techtime vs Synchroteam, plus our comparison of 8 field service management tools.

Sources: Obat pricing page and Techtime pricing, checked on 22 November 2026. Names and trademarks belong to their owners. If you notice a change, write to hello@techtime.fr and we will update this comparison.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes