Techtime news

Techtime at CMT Industrie

Techtime2 min read

Marc Walter, founder of CMT Industrie, at his workstation

Our Techtime team visited our customer CMT Industrie to discuss its business and best meet its organisational needs.

In brief

CMT Industrie, founded by Marc Walter, specialises in industrial boilermaking, maintenance and pipework for manufacturers and pharmaceutical groups. Its technicians work both in the workshop and at customers’ sites. Marc Walter needed to know who was doing what, for whom, when and how, and to keep control of lead times and costs. He chose Techtime, a web and mobile app, because it is so easy to use.

The company CMT Industrie

Marc Walter is the founder of this fantastic company, whose core business is industrial boilermaking, maintenance and pipework.
Boilermaking is an industrial field covering all the work involved in processing sheet metal, tubes and the various profiles used in industry.

CMT Industrie works mainly for large local companies, pharmaceutical groups, manufacturers and producers…

How it organises its worksite and mission activity

The stages:

First comes work on the customer’s 3D plans.

  • either the company receives the customer’s plans and CMT takes over the sheet metal work, cutting, bending and all contract work based on the customer’s own plan,
  • or the work is based on CMT’s own in-house design.

Once the design is approved, CMT programmes the various machines for cutting, plasma cutting and bending. Then it moves on to the workshop for assembly, welding and painting.
Finally, everything is delivered and installed at the customer’s site.

Diagram How a project runs at CMT Industrie
  1. 1DesignCustomer’s 3D plans or in-house design
  2. 2ProgrammingCutting, plasma, bending
  3. 3WorkshopAssembly, welding, painting
  4. 4DeliveryAnd installation at the customer’s site

The challenges:

Technicians work in the workshops but also directly at customers’ sites. For Marc Walter, the need is therefore to know Who is doing What, for Whom, When, with Whom and How. This means controlling both the process and the time spent (at the customer’s site, on deliveries, on welding…). Keeping control of lead times and costs is obviously important.

Diagram Two places of work to coordinate
In the workshopFabrication
  • Sheet metal work, cutting, bending
  • Assembly and welding
  • Painting
At the customer’s siteOn site
  • Delivery and installation
  • Industrial maintenance
  • Time spent to track

Why Techtime?

As Marc explains, his job is that of a tradesman and a business manager. It is essential for him to free up as much time as possible for his added value and expertise. Techtime, as a web and mobile app, helps him a great deal because it is very easy to use.
It lets him manage his worksites with control and efficiency, and get the feedback he needs.

Frequently asked questions

What does CMT Industrie do?

Industrial boilermaking, maintenance and pipework, mainly for large local companies, pharmaceutical groups, manufacturers and producers.

Why does CMT Industrie use Techtime?

To know who is doing what, for whom, when and how, and to control time spent, lead times and costs, with a web and mobile app that is very easy to use.

Is Techtime suitable for industrial companies?

Yes: CMT Industrie uses it to coordinate its technicians between the workshop and its customers’ sites.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes