What are the construction trades?

Techtime5 min read

Tradesman in a hard hat, arms crossed, tool belt at his waist, in front of a rebar site

In the building sector, many professions work on new-build or renovation worksites, across a wide range of trades. Site foreman, site manager, plant operator, bricklayer, timber framer, electrician or plumber: here is an overview of the different construction trades.

In brief

The construction trades are split between supervisory roles and the building trades. The site manager runs one or more worksites (deadlines, budget, recruitment, subcontractors) and delegates to the site foreman, who organises teams, schedules and safety on site. On the ground, in the order of the works, come the plant operator for earthworks, the bricklayer for foundations and walls, the timber framer, the roofer, the electrician and the plumber, with the painter and decorator among the last.

Site foreman

Among the construction trades, the site foreman plays a central role. It is the foreman who must check that the worksite is properly kept and progressing and ensure the quality of the works through to completion. The foreman works closely with the site manager, who passes on the instructions, plans and sketches for the worksite.

The site foreman’s duties are many:

  • organising the human and material resources needed for the works;
  • organising the different jobs;
  • managing schedules;
  • assigning tasks to the teams and to each trade;
  • complying with safety standards and workers’ working conditions: canteens, toilets, changing rooms, etc.;
  • reporting to management on the various events on the worksite.

Site manager

The site manager also holds an essential position among all the construction trades. Above site foremen in the hierarchy, this building professional may manage one or more worksites depending on their size.

The site manager is responsible for the smooth running of the worksite, in terms of meeting deadlines and the client’s expectations as well as the quality of the works carried out and financial management. Among other things, the site manager recruits the labour needed, contacts subcontractors and chooses materials, based on the architect’s plans and the engineering firms’ construction drawings.

The site manager works in constant contact with the client, the architect, suppliers, the accounts department and the site foreman, to whom tasks are delegated.

For day-to-day support, the site manager can also use worksite management software such as Techtime. With a web app or a mobile app, managing the works becomes simpler.

Diagram Site manager and site foreman
Site managerOne or more worksites
  • Deadlines, quality and financial management
  • Recruits, chooses subcontractors and materials
  • Liaises with client, architect, suppliers
Site foremanOn the ground
  • Organises teams, equipment and work
  • Manages schedules and assigns tasks
  • Oversees safety and reports back

Construction plant operator

In construction, plant operators also play a vital role. They are responsible for driving and manoeuvring various wheeled or tracked machines, including:

  • excavators or diggers;
  • loaders;
  • bulldozers or dozers;
  • graders;
  • scrapers;
  • compactors, etc.

The plant operator takes care of preparing the ground through various tasks such as levelling, earthworks or clearing soil or rubble.

But the job is not limited to operating machines: the plant operator must also carry out servicing and maintenance on the machines.

Timber framer

Another demanding construction trade is that of the timber framer. This professional works at several stages of the worksite. The timber framer draws up the full-size setting-out – a life-size technical drawing – from the architect’s plans or from 2D or 3D plans of their own. They can then cut the various structural members needed.

The timber framer knows the different properties of the timbers they may use during the works. This professional and their team handle the lifting and assembly of the timber members. They may work on different types of structure:

  • roofs;
  • building frames;
  • cladding;
  • formwork;
  • stairs;
  • wooden floors;
  • maintenance and renovation of old roof structures, etc.

Bricklayer

The bricklayer’s trade is obviously central to construction. Working in teams, bricklayers are responsible for:

  • building foundations;
  • putting up walls and partitions;
  • laying slabs.

Bricklayers work with different materials such as stone, brick and reinforced concrete. Far from the old image of the trade, this profession now requires a good command of mechanical tools: concrete mixers, electric and pneumatic vibrators, etc.

The bricklayer’s trade involves a great deal of teamwork, often physical, done outdoors, with frequent travel to worksites that are sometimes far from the company.

Roofer

On a construction worksite, the roofer usually comes in after the roof structure work. While roofers mainly deal with the roof, they may also work on façades.

The roofer’s main duties include:

  • Preparing the roof insulation.
  • Installing a timber structure to take the roof covering.
  • Carefully laying the roof covering using different materials: tiles, slate, aluminium. This is a vital step, as the roof’s watertightness depends on it.
  • Creating the openings needed to fit an element in the roof, such as a window.
  • Carrying out finishing work such as fitting gutters.
  • Repairing damaged roofs.

Electrician

Among the different construction trades is that of the electrician. On new-build or renovation worksites, this professional is responsible for installing and connecting:

  • lines;
  • cable networks;
  • circuit breakers, distribution boards or electrical cabinets;
  • the various fittings such as sockets or switches.

If the worksite requires it, the electrician may also install:

  • computer or telephone cabling;
  • boilers or air conditioning;
  • security systems.

The electrician must have a perfect command of the standards in force and safety rules. They also carry out a series of tests to check that the electrical installations comply. Finally, they commission the various equipment, in the presence of the site foreman and the client.

Painter and decorator

On a construction worksite, the painter and decorator is one of the last to come in. They can work on both new-build and renovation worksites, outdoors as well as indoors.

The painter and decorator’s duties are many and go well beyond simply applying paint:

  • Preparing walls and ceilings or floors: the painter must sand and fill surfaces so they are perfectly smooth. They must also wash them and check that they are impermeable.
  • Painting walls and ceilings by hand or by machine, in line with the client’s expectations.
  • Laying wall coverings: wallpaper, wall carpet, etc.

The painter and decorator’s trade calls for a degree of adaptability and versatility, as the nature of worksites changes regularly. This means good people skills, particularly with the client. The profession also requires technique and a strong sense of aesthetics.

Plumber

On a new-build or renovation worksite, the plumber must, in particular, set up the entire pipework network as effectively as possible. This professional installs, maintains and repairs water pipes as well as gas or heating-oil pipes.

The plumber’s trade is often combined with that of heating engineer and thermal installer. It is therefore not unusual for plumbers to handle the installation and maintenance of boilers, water heaters and, more and more often, even solar panels.

Plumbers are also versatile tradespeople with skills in masonry, and even electrics. Some companies ask for dual roles such as plumber-heating engineer, roofer or zinc worker.

Diagram The order in which the trades work
  1. 1Plant operatorEarthworks, levelling
  2. 2BricklayerFoundations, walls, slabs
  3. 3Timber framerFrame and roof structure
  4. 4RooferRoofing and waterproofing
  5. 5Electrician, plumberNetworks and equipment
  6. 6Painter and decoratorFinishes

Frequently asked questions

What is the difference between a site manager and a site foreman?

The site manager is higher in the hierarchy: they manage one or more worksites, their deadlines, their budget, recruitment and subcontractors. The site foreman checks progress and quality of the works on site and organises teams and schedules.

Which trade comes in last on a worksite?

The painter and decorator is one of the last to come in. They prepare surfaces, apply paint and lay coverings such as wallpaper.

What does a construction plant operator do?

They drive excavators, loaders, bulldozers, graders or compactors to prepare the ground (levelling, earthworks, clearing) and look after the machines’ maintenance.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes