Advice

How to prepare and organise a construction worksite

Techtime4 min read

Model house, glasses and architect’s plans on a desk

Please note: this article refers to French regulations and standards.

Preparing a worksite remains a crucial stage, between organisation and formalities, for the smooth running of the works ahead. Legal duration, responsibility, documents and administrative formalities, steps to follow: here is all our advice on preparing and organising a construction worksite.

In brief

Preparing a construction worksite in France starts as soon as the contract is awarded and generally lasts two months for a public contract and three months for a private one, with at least one month to draw up the PPSPS (specific health and safety plan). The client puts together the team and schedules the worksite, the project manager designs the project and the contractor prepares the execution. The preparation file must be compiled (site installation plan, construction drawings, schedule, PPSPS, staffing), formalities completed (DICT works notice, ten-year liability insurance…) and six steps followed, from equipment inventory to site set-up.

How long does it take to prepare a worksite?

Preparing and organising a worksite takes time and must comply with regulations. That is why a preparation period is needed to draw up all the documents relating to the execution of the works. In France, this period starts the day after the contractor is notified that the contract has been awarded.

The length of the worksite preparation period is set out in the tender documents (DCE). The contractor thus has a legal minimum of one month to draw up the specific health and safety plan (PPSPS).

But the preparation period also depends on the specific nature of the worksite and on the type of contract. The special administrative conditions (CCAP) set a period of:

  • two months for public contracts;
  • three months for private contracts.
Diagram Worksite preparation periods
Private contract (CCAP)
3 mois
Public contract (CCAP)
2 mois
Drafting the PPSPS (legal minimum)
1 mois

Who should prepare a worksite?

Preparing and organising a worksite is an important phase in which several parties are involved and have a role to play.

The client

The client has several responsibilities: they put together the preparation team, schedule the worksite and sign the works contract. They work closely with the project manager, the technical inspectors and, in some cases, the health and safety coordinator (CSPS).

The project manager

The project manager is responsible for designing the project: they must draw up the technical plan of the worksite, the tender file, the special administrative conditions and the price schedules.

The contractor

Responsible for carrying out the works, the contractor must prepare the worksite taking into account the specifications, legal deadlines and safety rules so that workers can work without risk.

Which documents are needed to prepare a worksite?

Preparing and organising a construction worksite involves drawing up the files and schedules needed for the project to run smoothly.

The worksite preparation file

The worksite preparation file must be sent by the contractor to the project manager. It must include several items:

  • the site installation plan (PIC): a drawing gathering the information needed to lay out and set up the worksite (lifting equipment, site welfare facilities, storage areas, fencing, etc.);
  • the construction drawings;
  • the worksite schedule ;
  • the specific health and safety plan;
  • the breakdown of planned staffing on the worksite.

The works execution schedule

Yellow hard hat, set square and plans on concrete blocks

This important document structures the worksite over time: each contractor knows when they must be on site, to carry out which tasks and for how long.

The execution schedule also shows the number of workers assigned to the worksite. This is vital information for planning welfare facilities large enough for everyone, in compliance with regulations.

Preparing a construction worksite: what administrative formalities?

Preparing and organising a construction worksite properly necessarily involves completing certain administrative formalities, including:

  • the Declaration of Intent to Start Works (DICT, a notice to network operators);
  • the ten-year liability insurance certificate;
  • the as-built plan of networks and structures;
  • informing the residents concerned when lifting equipment will pass over their property, etc.

6 steps to preparing a construction worksite properly

To help you prepare and organise a worksite properly, here are 6 steps to follow:

  1. Take an inventory of the equipment needed for the worksite, as well as the staff: remember to specify their particular features and how long they will be tied up;
  2. Select all the contractors who will be involved on the worksite;
  3. Select the equipment and organise its delivery to the worksite;
  4. Place orders with suppliers : equipment for workers, personal or collective protective equipment, materials, etc.;
  5. Obtain all the necessary administrative authorisations;
  6. Prepare the worksite using the installation plan: traffic routes, welfare facilities, etc.
Diagram 6 steps to preparing a construction worksite
  1. 1InventoryEquipment and staff
  2. 2SelectThe contractors
  3. 3OrganiseEquipment delivery
  4. 4OrderMaterials and equipment
  5. 5AuthoriseAdministrative formalities
  6. 6Set upAccording to the site installation plan

Techtime supports building companies in the day-to-day organisation of their worksites and jobs. Our construction software lets you schedule teams, centralise useful worksite information and collect field data, from the office as well as from the apps used on site.

Frequently asked questions

How long does it take to prepare a worksite?

In France, the CCAP generally sets a period of two months for public contracts and three months for private contracts. The contractor has at least one month to draw up the PPSPS.

What does the worksite preparation file contain?

The site installation plan, the construction drawings, the worksite schedule, the PPSPS and the breakdown of planned staffing. It is sent by the contractor to the project manager.

What administrative formalities are needed before a worksite?

In France, these include the declaration of intent to start works (DICT), the ten-year liability insurance certificate, the as-built plan of networks and structures, and informing residents whose property will be overflown by lifting equipment.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes