Please note: this article refers to French regulations and standards.
The building sector covers a wide range of trades and specialisms, each with its own characteristics. To record and list these activities as accurately as possible at national level, codes are assigned when a company is set up: NAF codes. Definition, use, benefits and lists of codes by trade: find out everything you need to know about NAF codes for construction trades.
In brief
The NAF code (or APE code, which is the same thing) is assigned automatically by Insee when the company is registered: 4 digits and 1 letter that identify its main activity. It appears on the Kbis and on payslips. In construction, it gives an indication of the applicable collective agreement and may be a condition for access to certain calls for tender. The codes fall into five families: building construction (4120A, 4120B…), insulation and roofing (4329A, 4391B…), demolition and installation (4311Z, 4321A…), finishing works (4331Z, 4334Z…) and property development (4110A…). A new classification, NAF 2025, applies from 1 January 2027.
What is the NAF code?
The NAF code – for “Nomenclature d’activités française” (French classification of activities) – is a code automatically assigned by the French National Institute of Statistics and Economic Studies (Insee) when your company is registered.
This code, made up of 4 digits and 1 letter, enables Insee to record companies and organisations according to their sector of activity. Insee also lists your activity under an APE code, for “Activité principale exercée” (main activity carried out by the company).
What are the differences between NAF and APE codes? There are none. Although the name changes, the number assigned stays the same. You may therefore find it under either name on official documents.
As a construction professional, you do not need to take any specific steps to receive a NAF code. It is one of the unique codes assigned to you as soon as you complete the setting-up of your company, such as:
- the Siret number;
- the Siren number;
- the VAT number;
- the RCS (trade and companies register) number.
Good to know
To find your NAF code, you can search for it on the Insee website according to your activity. You can also find the APE code on payslips, on the company’s Kbis or on the Commercial Court website.
- Assigned by Insee on registration
- 4 digits and 1 letter
- No formalities required
- Same number, different name
- On the Kbis and payslips
- Available on the Insee website
What is the NAF code used for?
For construction trades, the NAF code does more than list the various activities.
For choosing the collective agreement
In particular, it gives an indication of the construction collective agreement that applies to you. Note: it is the activity actually carried out that determines the applicable agreement; the NAF code is only an indicator.
As a reminder, the collective agreement sets all the rules that apply to your employees. For construction trades, there are several agreements:
- the national collective agreement for workers employed by construction companies with up to 10 employees;
- the national collective agreement for workers employed by construction companies with more than 10 employees;
- the national collective agreement for construction clerical staff, technicians and supervisors (ETAM);
- the collective agreement for construction managers.
For calls for tender
The NAF code can also matter when responding to a call for tender. Some pre-selections are based on the company’s APE code.
As a result, if your NAF code does not exactly match the sector of activity sought in the call for tender, you may not be able to apply.
NAF codes: the list for all construction trades
Discover the list of NAF codes assigned to construction trades, by activity and specialism. These are the codes of the current classification: from 1 January 2027, NAF 2025 will assign a new APE code to each company, which can already be looked up on the Sirene website using the SIREN number (source).
Houses, buildings, civil engineering (41-42)
Waterproofing, roof structures, roof coverings
Earthworks, electrical, plumbing
Joinery, plastering, painting
Housing, offices, other buildings
NAF codes for building construction
If your construction company specialises in building construction, the NAF codes are as follows:
- 4213A: Construction of engineering structures;
- 4120A: Construction of detached houses;
- 4120B: Construction of other buildings;
- 4213B: Construction and maintenance of tunnels;
- 4399C: General masonry and building structural works;
- 4399D: Other specialised construction works;
- 4291Z: Construction of water projects;
- 4211Z: Construction of motorways and roads;
- 4221Z: Construction of utility projects for fluids;
- 4212Z: Construction of underground and surface railways;
- 4222Z: Construction of electricity and telecommunications networks;
- 4299Z: Construction of other civil engineering projects n.e.c.
NAF codes for insulation, waterproofing and roofing
For companies specialising in insulation, waterproofing or roofing works, the applicable NAF codes are:
- 4399A: Waterproofing works;
- 4329A: Insulation works;
- 4391A: Roof structure works;
- 4391B: Roof covering works using components;
- 4322B: Installation of heating and air-conditioning equipment;
- 4399B: Erection of metal structures.
NAF codes for demolition, installation and earthworks
Companies carrying out demolition, installation or earthworks are assigned one of the following NAF codes:
- 4312A: Site preparation and routine earthworks;
- 4321A: Electrical installation work in all types of premises;
- 4322A: Gas and water installation work in all types of premises;
- 4312B: Large-scale or specialised earthworks;
- 4321B: Electrical installation work on public roads;
- 4329B: Other installation works n.e.c.;
- 4311Z: Demolition works;
- 4313Z: Test drilling and boring.
NAF codes for finishing works
The NAF codes assigned to companies carrying out finishing works may be:
- 4332A: Wood and PVC joinery works;
- 4332B: Locksmithing and metal joinery works;
- 4332C: Fitting out of retail premises;
- 4331Z: Plastering works;
- 4333Z: Floor and wall covering works;
- 4334Z: Glazing and painting works;
- 4339Z: Other finishing works.
NAF codes for property development
There are also NAF codes for the trades surrounding property development:
- 4110A: Residential property development;
- 4110B: Office property development;
- 4110C: Property development of other types of buildings;
- 4110D: Legal vehicles for development programmes.
Frequently asked questions
What is the difference between the NAF code and the APE code?
None: it is the same number, assigned by Insee, under two different names. It appears under either name on official documents.
Where can I find my company’s NAF code?
On the Insee website, on the Kbis extract, on payslips or on the Commercial Court website. It is assigned automatically when the company is set up.
What is the NAF code used for in construction?
It gives an indication of the construction collective agreement that applies to employees (the activity actually carried out is what determines it) and may be used as a pre-selection criterion in some calls for tender.






