Advice

Everything you need to know about the site manager’s job

Techtime6 min read

Site manager in a hard hat talking into a walkie-talkie on a worksite

Please note: this article refers to French regulations and standards.

The site manager plays an important role in every type of construction project, whether public or private. They have to organise and coordinate both the teams and the execution of the works, making this a key, highly responsible position in the building sector.
A true conductor, the site manager must make sure delivery deadlines and safety rules are met, while overseeing the various stages of the worksite.

In brief

The site manager organises and coordinates the teams and the execution of one or more worksites, in line with deadlines, budget and safety. In France, the job is open from two years of higher education (BTS, BUT), then via a professional bachelor’s degree or an engineering school, usually after a few years as a site foreman. Their tasks are administrative (plans, budget, quotes), managerial (recruitment, schedules, safety) and operational (coordination, quality, reports). An experienced site manager earns €3,000 to €4,500 gross a month.

How do you become a site manager?

To progress quickly in the building sector in France, it is best to reach two years of higher education, i.e. a BTS or DUT. There are several specialities, for example the BTS in construction and public works studies and economics, or the DUT in civil engineering with a public works, development or building option. If you want to continue your studies or specialise further, you can take a professional bachelor’s degree (three years of higher education) in building, civil engineering or construction.

Possible training courses

Below is a non-exhaustive list of French courses that give access to the site manager’s job.

Two-year higher education courses:

  • BTS building
  • BTS EEC – Construction studies and economics
  • BTS TP – Public works
  • Specialist technician in site management (ESTP)
  • Building and architecture draughtsman title (École Edaic Lyon)

Three-year higher education courses:

  • BUT Civil engineering – sustainable construction
  • Professional bachelor’s in construction trades – civil engineering and construction
  • Professional bachelor’s in construction trades – public works
  • Professional bachelor’s in construction trades – building and construction
  • Professional bachelor’s in construction trades – energy and environmental performance of buildings
  • Professional bachelor’s in energy, environment and HVAC engineering
  • Professional bachelor’s in site management (ESTP), technical manager in building and public works
  • Bachelor in building project management and construction economics (AFIP)
  • Bachelor in public works (ESITC Caen)

Five-year higher education courses:

  • International master’s in civil engineering of complex and nuclear structures (ESTP)
  • Engineering degrees in civil engineering or construction: ESTP, ENTP, Centrale Nantes, CESI, ISBA-TP

The monthly salary of an experienced site manager can range from €3,000 to €4,500 gross.

The job market

Man in a red hard hat giving a thumbs up at a desk with plans and a laptop

As a recent graduate, you are unlikely to go straight into a site manager position for your first job. You need a few years of field experience before you can apply for this role.

After your studies, you can start as a site foreman or assistant site manager.

If you graduate from an engineering school, however, you will have quicker access to positions of responsibility or more complex worksites. A beginner with a two-year qualification will more easily be given worksites whose plans and surveys have already been carried out.
In all cases, you need a good knowledge of the sector and strong team management skills to work as a site manager.

Career progression

Internal promotion

If you have been working as a construction technician or site foreman in the same company for several years, you may well be able to move up internally into a site manager position. Accessible with executive or supervisor status, it is above all field experience and knowledge of the sector that will be an asset for this job.

Moving to another company

A site manager’s duties can vary from one company to another, depending on its speciality. They can range from building detached houses to managing major road worksites. Companies with a design office and involved in complex worksites will rely more on engineers than those with few studies or surveys to carry out.

Career prospects will therefore be greater depending on the type of company you choose. Years of experience will also be a decisive factor.

Related jobs

Jobs similar to site manager include branch manager and works director. These positions, however, are mainly open to engineers.

As overall coordinator, the site manager’s role is close to that of a business owner, since they have to manage technical, financial and human aspects.

The works director, for their part, oversees several site managers. Their work is mainly focused on strategic management.

Allow a good ten years of experience to reach these positions.

Diagram A typical path to site management
  1. 12 to 5 years of higher educationBTS, BUT, professional bachelor’s, engineering degree
  2. 2First yearsSite foreman or assistant
  3. 3Site managerOne or more worksites
  4. 4After about ten yearsBranch manager, works director

The site manager’s tasks on the worksite

The site manager’s role has many facets. They guarantee that a worksite is carried out properly, both technically and logistically, and that deadlines and budgets are met.

Administrative tasks

The site manager is responsible for the formalities needed to start a worksite, in particular studying the plans and drawing up the overall budget for materials and human resources. They are also responsible for contacting any subcontractors and suppliers.
They study the specifications sent by the design offices to plan the duration of the works, have quotes drawn up and plan the materials and number of workers needed.

Management tasks

On the human resources side, the site manager recruits the technicians and tradespeople needed to carry out the worksite. They draw up their daily schedule for the various construction stages and must make sure they are properly supplied with equipment. Throughout the works, they are also the safety contact and must enforce labour law and environmental standards.

Operational tasks

On site, the site manager’s job is to coordinate the various tasks and contractors, manage the unexpected and check quality. They are also responsible for organising site visits and writing site meeting reports.

Additional tasks

The site manager may also negotiate contract terms with future clients, respond to calls for tenders or take part in quality audits.

Diagram The 4 families of tasks
Administrative

Plans, budget, quotes, subcontractors

Management

Recruitment, schedules, safety

Operational

Coordination, the unexpected, quality

Additional

Contracts, tenders, audits

Qualities and skills required

Organisation

The site manager must be very well organised. The progress and smooth running of the worksite depend on them, particularly in terms of meeting deadlines and the forecast budget. They must therefore be able to manage the various teams, partners and suppliers, coordinate them and schedule their work. Good resistance to stress and pressure is also a real asset.

Communication and management

The site manager must be able to communicate effectively with the various trades working on the worksite. These can be extremely varied, from suppliers to engineers, architects and technicians. Interpersonal and management skills are therefore essential for this position.

Technical skills

The site manager must be technically up to date on the construction sector and keep a constant watch on developments and news, particularly prices, innovation and materials. They must make proposals, know how to handle technical problems and take committed budgets into account. They are a true building technician, with in-depth technical knowledge.

Conclusion

Organisation, communication, management and technical expertise: the site manager is the conductor of the worksite, guaranteeing deadlines, budget and quality. Open from two years of higher education after a few years of field experience, the job then leads to branch manager or works director positions.

Frequently asked questions

What training do you need to become a site manager?

In France, two years of higher education (BTS building, BTS construction studies and economics, BTS public works) lets you progress quickly. You can continue with a professional bachelor’s degree (three years) or an engineering school (five years).

What does a site manager earn?

The monthly salary of an experienced site manager can range from €3,000 to €4,500 gross.

Can you become a site manager straight after your studies?

It is rare: you usually need a few years of field experience, as a site foreman or assistant site manager. Engineering school graduates move into positions of responsibility more quickly.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes