Please note: this article refers to French regulations and standards.
Every year, building work in France produces 46 million tonnes of waste, or 19% of all construction waste (source). The anti-waste law for a circular economy (AGEC) of 10 February 2020 created an extended producer responsibility scheme (REP Bâtiment). Building companies that belong to this scheme must provide collection points near their worksites to recover their waste. Which materials are concerned? How much is the eco-contribution in construction? How do you pass it on in your invoices?
In brief
Since the AGEC law, producers and distributors of building products and materials (PMCB) pay an eco-contribution to one of the four approved eco-organisations (Ecomaison, Ecominero, Valdelia, Valobat), which take charge of their waste. The amount depends on the type of material and its weight. The construction company passes it on to its customer as an eco-participation: it must appear on quotes and invoices, and VAT is charged at the rate applicable to the work.
1Eco-contribution in construction: who and what does it cover?
The eco-contribution applies to companies involved in producing or distributing building products and materials (PMCB). This financial contribution covers manufacturers, distributors, importers and introducers. PMCB are intended for construction or renovation work in France.
Members pay a sum to an eco-organisation approved by the State. In return, these organisations take charge of their waste. There are four of them:
- Ecomaison;
- Ecominero;
- Valdelia;
- Valobat.
Each sets its own rates and specialises in treating one or more types of waste. If a company does not want to join one of these eco-organisations, it must finance its own collection and waste sorting system. Its obligations are free take-back of its waste and a financial guarantee against default (source).
Category 1: inert products and materials
Categories 1 and 2
Category 2: other products and materials
Category 2: other products and materials
Which materials are subject to the eco-contribution in construction?
The eco-contribution applies to two main categories of building products and materials (PMCB). These materials are used to construct the building or for the fittings needed for its use, including vehicle parking (source).
| Category 1: inert materials and products (containing no glass, mineral wool or plaster) | Category 2: other building materials and products, mainly made up of the following |
|---|---|
| • concrete and mortar; • lime; • building stone (granite, sandstone, limestone, etc.); • fired or unfired clay; • slate; • bituminous mixes; • ceramics (tiles); • construction products and materials of mineral origin. | • metal; • wood; • glass or glazed walls; • renders, paint, varnish or resin; • plaster; • plastic; • bituminous membranes; • glass wool or rock wool; • plant or animal-based or other materials not listed. |
Details of the scope of the REP Bâtiment are set out in notice to producers no. 0139, published on 17 June 2023 in the Official Journal.
Which materials are excluded from the REP Bâtiment scheme?
Some construction products or materials are excluded from the eco-contribution:
- Excavated soil.
- Products used temporarily on the worksite: packaging, pallets, protective equipment, formwork forms, PPE, etc.
- Industrial tools and technical equipment.
- Products and materials intended for public works outside the building scope: roads, civil engineering, pipes, earthworks, etc.
- Basic nuclear installations (article L. 593-2 of the French Environment Code).
- Funerary monuments.
- Products covered by another REP scheme (hazardous chemicals, electrical or electronic equipment, DIY, sports or leisure items, etc.).
For dual-use products or materials (public works or building worksites), whether the eco-contribution applies depends on their use. It always applies to a product mainly used for building, even if it is sold to a public works company. The reverse is not true. If materials are used equally in both (aggregates, cement, etc.), exemption certificates are available for public works companies. These certificates, like the list of dual-use products, can be found on the website of the Approved Coordinating Body for Building (OCAB).
2How are eco-contribution amounts set in construction?
Each of the eco-organisations above publishes its scale for treating PMCB every year. The amount depends on the type of material and its weight in kilograms or tonnes. Even though the eco-organisation sells its members’ waste as secondary raw materials, the eco-contribution supplements its income (source).
The State-approved eco-organisations differ in the categories of products they handle. Only Valobat takes back waste from both PMCB categories.
Eco-contributions increase the price of materials and, in turn, construction costs. To protect your profitability, you pass your contribution on to your customer, who pays it as an eco-participation.
- 1Producerpays the eco-contribution to an eco-organisation
- 2Materialsthe price includes the contribution
- 3Quote and invoicethe company shows it and applies VAT
- 4Customerpays the eco-participation
3How do you invoice your eco-contributions with your construction software?
If you are a company covered by the REP Bâtiment, you must show your eco-contributions on your quotes and invoices. You must add the corresponding clause to your general terms of sale. The eco-contribution cannot be reduced or discounted. However, you can group all your eco-contributions on a single line or show them under each product. Be sure to state an amount excluding VAT, without adding a margin.
The eco-contribution is subject to VAT under article 267 of the French General Tax Code. As a price supplement, its rate is that of the work. For example, if the work is taxed at the reduced rate of 5.5%, the same applies to its eco-contributions. In your accounts, paying your contribution to the eco-organisation is treated as a subcontracting transaction.
With Techtime, you benefit from electronic document management that lets you sort documents, such as those relating to the eco-contribution. Thanks to this feature and many more, you get the following benefits:
- You save time managing your worksites by applying the right taxes correctly.
- You cut costs by managing your expenses and stock more efficiently.
- You become more productive by planning your resources precisely.
You invoice your eco-contributions according to your eco-organisation and the VAT rate of your work. Your client pays them as an eco-participation. To save time managing these transactions, do not hesitate to consult our specialists!
Frequently asked questions
Who pays the eco-contribution in construction?
Companies that produce or distribute building products and materials pay it to an eco-organisation. It is built into the price of materials and then passed on to the end customer as an eco-participation.
Which materials are excluded from the eco-contribution?
In particular excavated soil, products used temporarily on the worksite (packaging, pallets, protection), industrial tools and equipment, materials for public works outside building, basic nuclear installations and funerary monuments.
Is the eco-contribution subject to VAT?
Yes. Under article 267 of the French General Tax Code, it is a price supplement: its VAT rate is that of the works.






