Please note: this article refers to French regulations and standards.
Every year in France, the Assurance Maladie (French national health insurance) records around 56 workplace accidents per 1,000 employees in the construction sector. Falls from height (1 in 5 fatal accidents in 2024, according to the OPPBTP) and manual handling remain the leading causes of serious incidents. This reality places business owners before a major responsibility: protecting their teams while securing their business legally.
In this context, two documents structure prevention: the PPSPS and the prevention plan. Often confused, they nevertheless follow distinct regulatory logics. In 2025, recent case law strengthened companies’ obligations, including for one-off maintenance or delivery jobs.
Techtime helps you tell them apart so you can avoid criminal penalties and manage your worksites effectively and safely.
In brief
The PPSPS and the prevention plan cover different situations and never apply together on the same worksite. The PPSPS concerns building or civil engineering worksites where several companies work under SPS (health and safety) coordination: each company drafts it and sends it to the SPS coordinator within 30 days of signing the contract. The prevention plan applies when an outside contractor works on a site in operation; it must be in writing above 400 hours over 12 months or for hazardous work. Failing to have one is punishable by a €9,000 fine, €15,000 for a repeat offence.
1How do you stop confusing the PPSPS and the prevention plan?
PPSPS or prevention plan: which safety document applies on a construction worksite?
To avoid any confusion between the PPSPS and the prevention plan, construction tradespeople should follow a simple rule: the type of work (construction worksite or site in operation) and co-activity (several companies present) determine the measures to take.
Case 1: construction worksite with co-activity (several companies): PPSPS + SPS coordination
Practical examples: building a house, major renovation, extension, a worksite with a bricklayer, roofer, electrician and drywall installer.
If the operation requires SPS coordination (building or civil engineering worksite with several contractors), each company must draw up a PPSPS (specific health and safety plan).
This plan is sent to the SPS coordinator and serves as the basis for organising prevention on the worksite.
In short, the PPSPS means a construction site, joint activity and SPS coordination.
Source: Legifrance, Article L4532-9
Case 2: an outside contractor working on a site in operation: prevention plan
Examples include HVAC maintenance, electrical call-outs, and plumbing work in a factory, a warehouse, a logistics site or an open shop.
When an outside contractor works on a host company’s site, it is essential to draw up a prevention plan to minimise the risks of interference (traffic, energy, chemicals, work at height, etc.).
The prevention plan must be drawn up in writing in two situations:
- When the work lasts more than 400 hours over a 12-month period;
- When the work is classed as hazardous by the regulations.
It is important to note that the prevention plan applies to three entities: the site in operation, the outside contractor and the host company.
Source: Legifrance, Article R4512-7
- Building or civil engineering worksite with several companies
- SPS coordination
- Sent to the SPS coordinator within 30 days of signing
- Outside contractor working at a host company
- In writing above 400 hours over 12 months or for hazardous work
- Drawn up before the work starts
The PPSPS: the tool for construction worksites with co-activity
The specific health and safety plan (PPSPS) applies only to construction and civil engineering worksites. As soon as several companies (or self-employed workers) work on the same building or civil engineering operation subject to SPS coordination, the provisions of Article L4532-9 of the French Labour Code apply.
The coordinator, appointed by the client, oversees the prevention of risks linked to co-activity and provides for the use of shared resources to ensure safety on a worksite. They make sure the PPSPS is consistent with the General Coordination Plan (PGC), which brings together all the safety measures to apply on the worksite. If there is a gap, they can request a correction or alert the client if the breach is serious.
The drafting of this specific safety plan is governed by Articles R.4532-56 to R.4532-74 of the French Labour Code. For example, under Article R.4532-67 it must include the following:
- First-aid instructions for victims of accidents or illness;
- The number of workers trained in first aid;
- The medical equipment on the worksite;
- Arrangements for transfer to a hospital in the event of a serious accident.
The PPSPS must be sent to the SPS coordinator no later than 30 days after the contract is signed (Article R.4532-56). This deadline is reduced to 8 days for certain finishing or ancillary works, when they present no particular risks. In practice, a company must not start its work until its PPSPS has been drawn up and sent to the SPS coordinator as required by the regulations. The PPSPS must then be available on the worksite and brought to the teams’ attention so that the prevention measures are actually applied on the ground.
Good to know: if working methods change (new equipment or a new hazardous task), the plan must be updated by amendment.
To strengthen your management, see also our guide: 7 steps to successful worksite monitoring.
The prevention plan: managing interference on a site in operation
The prevention plan (PdP) for an outside contractor applies when it works on a host company’s site. It sets out the overlapping risks, specifies traffic rules and details the appropriate safety measures.
According to data published by the Assurance Maladie (see the link in the introduction), occupational risks linked to outside contractors remain high, at around one workplace accident every two minutes. The occupational risk prevention plan then becomes an essential contractual and legal tool.
Good to know: a worksite falls either under SPS coordination or under the prevention plan. In other words, the two plans can never apply together on the same worksite.
2When does drafting these documents become a legal obligation?
What are the PPSPS thresholds by worksite category?
The regulations classify worksites into three categories:
- Category 1 operations exceed 10,000 person-days and involve at least 10 companies in building or 5 in civil engineering. They require the creation of a CISSCT (inter-company health, safety and working conditions committee);
- Category 2 worksites are operations exceeding 500 person-days or lasting more than 30 days with more than 20 workers at peak. They involve at least 2 companies. A prior declaration to the relevant bodies is required.
- Category 3 covers all other operations involving at least two companies and fewer than 500 person-days. Each company must draw up a PPSPS suited to the nature of its work.
For the first two categories, the PPSPS is mandatory and subject to prior declaration to the SPS coordinator.
Special case: a company working alone must draw up a PPSPS if the worksite lasts more than a year with more than 50 workers for at least 10 days.
- Category 1More than 10,000 person-days
At least 10 companies in building or 5 in civil engineering, CISSCT mandatory
- Category 2More than 500 person-days
Or more than 30 days with more than 20 workers at peak, at least 2 companies
- Category 3All other operations
At least two companies and fewer than 500 person-days
What are the criteria and deadlines for the prevention plan?
Under Article R4512-7 of the French Labour Code, a prevention plan is mandatory in two cases:
- when the work exceeds 400 hours over 12 months;
- when the work appears on the list of hazardous work for the prevention plan set by the order of 19 March 1993.
Hazardous work under the prevention plan includes in particular work at height, work exposing people to hazardous chemical agents and work on electrical installations.
In these cases, the worksite prevention plan must be put in writing before work starts. It engages the liability of both parties.
3What is the impact of the 14 January 2025 ruling on your obligations?
How does extending the PPSPS to maintenance and delivery providers change your practices?
The ruling of 14 January 2025 (no. 23-84.130) by the French Court of Cassation points out that every company taking part in the operation must be included in the worksite risk analysis, including for one-off jobs.
Maintenance technicians, equipment hire companies and some delivery providers must be better included in risk assessment and in organising prevention on the worksite, even for one-off jobs. This decision underlines the importance of including these measures in the prevention system (PGC/PPSPS) where necessary. It follows the fatal accident of a specialist technician during maintenance on a crane, a task that was not mentioned in the PPSPS.
This change calls for closer checks by the main contractor. A detailed analysis of the 2025 case law by BTUP shows its practical scope.
What are the legal risks and financial penalties for non-compliance?
Having no PPSPS or company prevention plan exposes you to a fine of up to €9,000, rising to €15,000 for a repeat offence (Legifrance).
In the event of a serious accident, the business owner can be held criminally liable for involuntary manslaughter. The courts examine the compliance of the risk prevention plan or PPSPS, and how it was actually implemented on the ground.
4How do you write a safety plan that really works?
What do the PPSPS and the PdP have in common?
The PPSPS and the prevention plan share the same goal: to set out the risks and organise prevention in practice before any work starts. Their common base rests on several key elements:
- identifying worksite risks or interference risks;
- the general organisation of the works;
- facilities (traffic areas, site welfare facilities, access);
- organising first aid and evacuation;
- prevention measures and the PPE required.
The timing differs slightly but follows the same logic of planning ahead:
- the PPSPS is drafted before the worksite starts;
- the outside contractor’s prevention plan is drawn up before the work starts, following the joint inspection.
In both cases, an update is mandatory if working conditions change, if the parties involved change or if new risks appear.
What is specific to the PPSPS?
The PPSPS is drafted by each contractor on the basis of the General Health and Safety Coordination Plan (PGCSPS), which is drafted by the SPS coordinator.
The PPSPS contains four main parts:
| PPSPS section | Content |
|---|---|
| General information | • Company name and address • Nature of the works • Contact details of the works manager, the client, the project manager and the SPS coordinator • Names and contact details of subcontractors • Expected changes in headcount and dates of work |
| Organising first aid and evacuation | • Number of employees trained as workplace first-aiders (SST) • Type and location of first-aid equipment • Procedures for raising the alarm and evacuating a casualty |
| Worksite facilities | • Location of hygiene facilities • Working conditions • Planned commissioning dates |
| Working methods and prevention measures | • Detailed task analysis • Equipment and installations used • Analysis of staff movements |
Once drafted, the PPSPS is reviewed by the SPS coordinator, who may require adjustments. It must be available not only to the teams but also to the occupational doctor, the CSE (works council), the labour inspectorate, the OPPBTP or the CARSAT.
Good to know: the PPSPS is never set in stone. Every worksite contingency can change the risk analysis: a schedule change, a new company, a technical adjustment.
What is specific to the prevention plan?
The prevention plan, by definition, is based on an analysis of possible interference between activities: internal traffic, chemical risks, work at height, electrical work.
The document details:
- the potential risks linked to each party’s activities;
- coordination measures;
- instructions specific to co-activity;
- the PPE required;
- first-aid arrangements.
Everyone concerned on site must be informed of and involved in the measures adopted.
5Summary: who does what for the PPSPS and the prevention plan?
- The client: responsible for organising SPS coordination when it is required and for appointing an SPS coordinator.
- The SPS coordinator: organises the prevention of co-activity risks, draws up and updates the PGC and ensures that safety measures are consistent.
- The main contractor: coordinates execution on the ground and makes sure contractors apply the safety instructions properly.
- Each company working on the worksite: must draw up and regularly update its specific health and safety plan (PPSPS), including its procedures and prevention measures.
- The host company (site in operation): carries out the interference risk analysis with the outside contractor and puts the prevention plan in writing when required.
- Outside companies and subcontractors: must apply the planned measures (PPSPS or PdP, as applicable) and make sure their teams know them.
6Why digitalise the management of your safety documents?
During a labour inspection, an unsigned document, an outdated version or incomplete distribution can be enough to engage your liability. With electronic document management (EDM), you centralise all your PPSPS, annual prevention plans, joint inspections and safety reports in a secure environment structured for construction.
Each document is:
- time-stamped;
- automatically versioned;
- accessible on the move;
- traceable in the event of an inspection or dispute.
You organise your files by worksite, by outside contractor or by type of work. You can find a safety prevention plan, an amendment or a signed acknowledgement of receipt in seconds.
Built-in electronic signatures simplify safety inductions. Every employee, subcontractor or provider confirms they have read the risk prevention plan from their smartphone. You have immediate, enforceable proof that meets regulatory requirements.
Frequently asked questions
What is the difference between a PPSPS and a prevention plan?
The PPSPS concerns construction worksites with co-activity subject to SPS coordination. The prevention plan concerns an outside contractor working on the site of a host company in operation. A worksite falls under one or the other, never both.
When must the prevention plan be in writing?
Under Article R4512-7 of the French Labour Code, when the work exceeds 400 hours over 12 months or when it appears on the list of hazardous work set by the order of 19 March 1993. It is drawn up before the work starts, following the joint inspection.
What are the penalties for having no PPSPS or prevention plan?
A fine of up to €9,000, rising to €15,000 for a repeat offence. In the event of a serious accident, the business owner can also be held criminally liable.