7 rewarding collaborations between landscapers and construction trades

Techtime6 min read

Landscaper planting shrubs in a mulched bed

As we explain in our overview of the landscaper trade, it is not considered a construction trade in the strict sense. That does not stop landscapers working with construction professionals on a range of projects, from private gardens and public ones to greening urban infrastructure. The aim is to meet technical and environmental requirements and offset the 20,000 hectares of natural land built over every year in France (source). Discover 7 examples of synergies between landscapers and construction trades.

In brief

The landscaper is not strictly a construction trade, but works with many trades: the bricklayer for low walls, paths and steps, the engineer for rainwater management and green roofs, the electrician for outdoor lighting, the urban planner to revitalise urban space, the plumber for irrigation and drainage, the carpenter for pergolas and decking, and the earthworks contractor to prepare the ground. These collaborations require precise coordination of the work.

Diagram The landscaper and 7 construction trades
Bricklayer

Low walls, paths, steps

Engineer

Rainwater, green roofs

Electrician

LED lighting, outdoor sockets

Urban planner

Revitalising urban space

Plumber

Irrigation and drainage

Carpenter

Pergolas, decking, fencing

Earthworks contractor

Preparing and levelling the ground

1Working with a bricklayer to create a durable outdoor space

The bricklayer and the landscaper both work on outdoor developments, from private gardens to public parks. Once the ground is prepared, the bricklayer builds the hard landscaping, such as low walls, paths, benches, steps or terraces. These are made of natural stone or concrete. They also build pond bases or the plinth onto which waterfalls flow.

Once these structures are ready, the landscaper uses plants to blend these artificial elements into nature. The added value is not only aesthetic but also durable. Natural stone stands up better to the weather, while permeable concrete stops water pooling (source). In addition, trees or planted pergolas protect benches and terraces from rain and sun as much as people. This limits wear.

The same professional can combine both trades under the title “landscape bricklayer” (source). They follow the same training as a landscaper but hold a specialisation certificate in hard landscaping. In France, their average salary is €1,950 a month (source).

2Teaming up with an engineer to manage rainwater harvesting

The landscaper designs land developments together with an architect or civil engineering expert. The aim is to do everything possible to use rainwater directly instead of discharging it into the sewer network.

To do this, the landscape designer works on the following projects (source):

  • Greening the roofs and terraces of buildings. Plants protect the waterproofing of structures by absorbing temperature swings and extend their lifespan. A green roof has a life expectancy of 50 years, twice that of an asphalt or gravel roof.
  • Creating rain gardens, partly floodable, in the form of parks, car parks or playgrounds. These features also restore soil fertility.
  • Designing eco-districts entirely dedicated to greenery and permeable soils.

These features help reduce the impact of the weather on cities, such as floods or heatwaves. A well-designed cool island lowers the perceived temperature by 2 to 8°C.

3Coordinating with an electrician for energy-efficient lighting

The gardener and the electrician highlight the key features of a garden or park through a lighting plan. LED fittings set in spotlights are used to highlight trees, flower beds or paths. Beyond the aesthetic aspect, they also make the site safe at night.

When they are not working on a green space, the electrician installs outdoor sockets for electric gardening equipment. These sockets reduce the risk of accidents for the gardener compared with using extension leads outdoors.

Finally, both professionals advise owners on saving money when running their gardens. The electrician installs solar panels to power not only gardening equipment but also indoor appliances. The landscape gardener creates vegetable gardens or recommends planting certain fruit trees for owners who love fresh fruit and vegetables (source).

4Working with an urban planner to revitalise urban space

When working with an urban planner, the landscape designer moves beyond the building or green space to a larger scale. This time, the task is to rethink the layout of a square, an avenue or an esplanade to make it greener.

As Sophie Chevillard’s dissertation shows (source), the landscaper integrates the living environment as a whole into urban space. It is not just about making the city beautiful, but about creating connections between residents and their surroundings. Protecting the environment, through soil fertility, is also a central concern.

To achieve these goals, the landscaper and the urban planner define areas to preserve topsoil or wooded clusters. Buildings and footpaths now adapt to different terrains, for greater comfort and views of the landscape. Community gardens are created to bring residents together around a useful, unifying project.

5Working with a plumber on irrigation systems

When the landscape gardener adds different plant species to a park or garden, they must think about their daily water supply. That is why the plumber installs and maintains the following systems (source):

  • Irrigation systems in the form of rotary sprinklers or spray nozzles. These are programmable and designed to water economically.
  • Underground drainage solutions to channel water away from sensitive areas such as a house’s foundations. They take the form of perforated pipes or French drains.
  • Automatic sprinklers placed away from obstacles such as trees or shrubs.

6Working with a carpenter to enhance outdoor structures

The joiner or carpenter designs and builds various pieces of garden furniture, such as pergolas, timber decking, fences, etc. (source). For all these structures, the landscaper advises on which timber to use to suit the style of the green space. They also recommend species that resist weather or drought, such as oak, teak, ipe, composite wood, etc. The landscaper then dresses the pergola with plants to create a cool, attractive shelter.

7Partnering with an earthworks contractor to prepare the ground

Before laying decking or planting new vegetation, the ground must be prepared to stabilise it or make it fertile. That is why the landscaper calls on an earthworks contractor to clear, excavate and level the ground so that it is even. This preparation is needed for the foundations of garden structures (decking, greenhouses, swimming pools, etc.) or for installing a drainage system (source).

Once the ground is ready, the landscaper plants trees and sows lawn seed. Self-propelled machines such as turf seeders and overseeders help with the job. Afterwards, they handle maintenance, such as weeding, felling dangerous trees or mowing the lawn.

8Other examples of synergy between landscapers and construction trades

In addition to the collaborations above, the landscaper may work with other construction trades, including the following:

  • Roofer and zinc worker. Installs roofing elements that can later be planted.
  • Ironworker and mosaic artist. They make decorative elements that fit into outdoor structures. Iron or ceramic shards play the same aesthetic role as flower beds or the shape of shrubs.

Conclusion

Collaboration between a landscaper and construction trades is essential to bring harmony and durability to new urban centres. These players combine aesthetics with economy and resilience, through energy-efficient lighting, green roofs and rain gardens. The ambition of these new urban projects is to bring city dwellers back together in spaces for living and well-being.

But to do this, every action must be prepared and coordinated down to the last detail. That is why Techtime is the management tool you need to build the cities of tomorrow.

Frequently asked questions

Which construction trades does the landscaper work with?

Mainly the bricklayer, the civil engineer, the electrician, the urban planner, the plumber, the carpenter or joiner and the earthworks contractor, but also the site manager, the roofer and zinc worker, the ironworker and the mosaic artist.

What is a landscape bricklayer?

A professional who combines both trades: they build the masonry structures of outdoor developments and integrate them into a landscape project.

How does the landscaper help manage rainwater?

Together with an architect or civil engineering expert, they green roofs and terraces, create partly floodable rain gardens and design eco-districts with permeable soils, which limit flooding and heatwaves.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes