Cutting, drilling or sanding many materials generates toxic dust on worksites. Despite changes in regulations, this pollution still claims many victims. France’s national health insurance (Assurance Maladie) estimates that asbestos still causes up to 4,000 occupational diseases a year (source). The INRS (French national research and safety institute) puts the number of employees exposed to silica at 358,000 (source). Faced with such major health risks, how can you protect yourself from worksite dust?

In brief

The most dangerous worksite dusts are asbestos, crystalline silica, hardwood sawdust and metal dust: they can cause silicosis, cancers or lead poisoning. In France, asbestos still causes up to 4,000 occupational diseases a year and 358,000 employees are exposed to silica. Employers must protect their employees by combining five measures: vacuum and air purifier, wetting during cutting, ventilation, suitable respirators and risk training.

1The 4 types of worksite dust most dangerous to health

Worksites generate several types of dust depending on the materials being worked. They are either irritant or toxic to the body. Discover the 3 families of fine particles that pose a major risk to your health.

Diagram The 4 most dangerous types of worksite dust
Asbestos

Mesothelioma, asbestosis

Crystalline silica

Chronic bronchitis, silicosis

Hardwood

Allergies, carcinogenic woods

Metals

Lead poisoning, cancers, neurological disorders

Mineral dust: asbestos and crystalline silica

Asbestos and crystalline silica are minerals found naturally in many rocks. Silica is a raw material in most construction materials: bricks, tiles, mortar, concrete, etc. Asbestos was the main component of building insulation in France until 1997, thanks to its low thermal conductivity (source).

The finest dust from these minerals (down to 0.02 ÎŒm in diameter) can settle in the pulmonary alveoli if inhaled. As progressive diseases, these deposits cause lung cancers or other more specific diseases after a latency period.

  • Asbestos can cause mesothelioma if it settles on the pericardium or pleura, or asbestosis, a hardening of lung tissue.
  • Crystalline silica causes chronic bronchitis or silicosis, a progressive and irreversible disease that can lead to heart or respiratory failure.

Organic dust: sawdust

Cutting, sawing or sanding hardwood produces dust in the form of sawdust. The finest particles get into the lungs. Some workers develop allergic symptoms such as eczema or rhinitis. In the most serious cases, regular inhalation of wood dust can lead to sinus cancers or pulmonary fibrosis (source).

Hardwoods such as oak, ash, maple or beech are recognised as carcinogenic at European level. You should also beware of the chemicals used to treat wood, such as paints, glues, resins, etc.

Metal dust: a risk of poisoning

As with wood, working on metal parts (cutting, grinding, welding) produces sparks and extremely fine dust. These may be parts made of steel, aluminium, copper, zinc, lead, etc.

The body absorbs and stores metal aerosols because of their high reactivity. Their toxicity leads to serious diseases such as lead poisoning or cancers. Heavy metals such as chromium, lead, zinc or cadmium are among the elements most dangerous to workers’ health and the environment. The lungs and brain are the organs most likely to develop serious symptoms due to the toxic effects of metals (source):

  • neurological disorders (memory, concentration, headaches, etc.);
  • lung diseases;
  • respiratory disorders (cough, chest pain);
  • etc.

Several articles of the French Labour Code regulate dust management to ensure safety on a worksite:

  • Article R. 4222-10 sets “the average concentrations of total and alveolar dust in the air inhaled by a worker.” These must not exceed 4 and 0.9 mg per cubic metre of air over an 8-hour period. The employer determines dust concentrations on the worksite through a risk assessment.
  • Article L4121-1 requires employers to take “the necessary measures to ensure safety and protect the physical and mental health of workers.” Risk prevention, a key part of the worksite prevention plan, is one of the recommended actions.

On the basis of Article R. 4222-10, worksite dust is classified according to the occupational exposure limit (OEL). The classes correspond to the concentration of airborne particles that can be inhaled over 8 hours of work without major health risk.

Dust classTypes of dustOELMinimum extraction efficiency of vacuums (according to IEC 60335-2-69)
Class Lgypsum (plaster); lime> 1 mg/m399 %
Class Mwood; paint; plastic≄ 0.1 mg/m399,9 %
Class Hmetals (lead, nickel, copper, coal, etc.); silica< 0.1 mg/m399,995 %
Asbestos (additional requirement)Asbestos fibre10 fibres/dm399,995 %
Diagram Dust classes: from most to least dangerous The more dangerous the class, the more efficient the worksite vacuum must be (IEC 60335-2-69 standard).
  1. Asbestos10 fibres/dmÂł

    Additional requirement: 99.995% extraction

  2. Class HOEL < 0.1 mg/mÂł

    Metals, silica: 99.995% extraction

  3. Class MOEL ≄ 0.1 mg/mÂł

    Wood, paint, plastic: 99.9% extraction

  4. Class LOEL > 1 mg/mÂł

    Plaster, lime: 99% extraction

35 solutions to protect yourself from worksite dust

A worksite produces a large amount of waste, above which dust can hang. Discover our 5 tips to protect yourself from these toxic particles in all circumstances.

Worksite vacuum and air purifier

Unlike a household appliance, a worksite vacuum has greater electrical power, storage volume and suction capacity. Depending on the model, it cleans up both liquid and solid deposits. Automatic filter cleaning makes cleaning your worksite more efficient.

To protect your employees during indoor work, consider installing a professional air purifier. This device captures the finest dust that may escape the worksite vacuum. However, it can be heavy, bulky and create noise.

Wetting during cutting or drilling

By spraying your work areas with a mister or a hose, dust clumps around the water droplets and is brought down. Demolition or energy renovation work enjoys a healthier atmosphere. Using a mister is better than a hose connected to a tanker for the following reasons:

  • Less water is used. You reduce the risk of creating mud on the worksite.
  • The water droplets are smaller. As a result, they bind more easily with fine dust.

On-tool or general worksite ventilation

Worksite ventilation can be carried out in two different ways:

  • On-tool extraction sucks up dust where it is produced. It uses a portable tool connected to a worksite vacuum.
  • General ventilation dilutes residual pollution by expelling airborne particles outside the site. It complements on-tool extraction for optimal efficiency (source).

Wearing respirators or respiratory protective equipment (RPE)

The choice of respiratory protective equipment (RPE) depends on the results of the risk assessment. The higher the filter rating, the better the protection. Of course, your personal protective equipment (PPE) should also include overalls and safety glasses to avoid any contact with worksite dust.

Masks come in three different forms:

  • A half mask with a P2 or P3 filter. These filters absorb more than 95% of toxic dust such as wood, asbestos or metals.
  • A disposable filtering half mask of type FFP2 or FFP3, with an exhalation valve. They protect employees from metal or radioactive particles.

A half mask with powered ventilation (TM2P) when exposure lasts more than 1 hour.

Training in dust-related risk prevention

Make your workers aware of the risks of worksite dust through professional training. Highlight good hygiene practices at work and the importance of regular medical monitoring. Don’t hesitate to give them information sheets on the risks they are exposed to and how to prevent them.

Diagram Protecting yourself from dust: two complementary levels
Collective protectionFor the whole worksite
  • Worksite vacuum and air purifier
  • Wetting during cutting and drilling
  • On-tool extraction and general ventilation
Personal protectionFor each employee
  • P2 or P3 half mask, FFP2 or FFP3 mask
  • Powered ventilation beyond one hour
  • Training in risks and hygiene

Protect your team members from worksite dust with personal (mask, overalls) and collective (vacuum, fan, showers, etc.) protection measures. Keep them informed of the risks they are exposed to when working on a given part of the construction. Keep your equipment catalogue up to date to ensure technicians’ safety with the Techtime app.

Frequently asked questions

What are the most dangerous types of worksite dust?

Mineral dust (asbestos and crystalline silica), hardwood sawdust and metal dust. When inhaled, the finest particles settle in the lungs and can cause silicosis, mesothelioma, asbestosis, cancers or lead poisoning.

Which mask should you wear against worksite dust?

A half mask with a P2 or P3 filter, which absorbs more than 95% of toxic dust, or a disposable FFP2 or FFP3 filtering half mask. Beyond one hour of exposure, a half mask with powered ventilation (TM2P) is recommended.

How can you reduce dust on a worksite?

By using a worksite vacuum suited to the dust class and an air purifier, wetting cutting and drilling operations, and ventilating the worksite through on-tool extraction or general ventilation.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes