Advice

Labour shortages in the building trade: how to address them

Techtime6 min read

Worker in a yellow hard hat and high-visibility vest carrying a pipe on a worksite

Households’ financial difficulties and the roll-out of the MaPrimeRénov’ scheme have led to a drastic fall in orders for new homes in France. Some 13,330 jobs are said to have been lost between 2022 and 2023. The French Building Federation fears an exponential rise in construction job losses, which could reach 150,000 by 2025 (source). How can labour shortages in construction be stopped in such unfavourable circumstances?

In brief

Construction struggles to recruit: France Travail (the French public employment service) counted 213,850 recruitment plans in the sector in 2024, and the average share of recruitment difficulties reached 72.7%. Bricklayers, plumbers and heating engineers, electricians, roofers and joiners are the most sought after. To address this, companies can retain their employees (pay, quality of working life, training) and attract new candidates by promoting the trades, making them more accessible, showcasing their company culture and developing off-site construction.

1Labour shortages in construction: the trades hit hardest

In its 2024 Labour Needs survey (BMO) (source), France Travail counted 213,850 construction recruitment plans across France. The regions looking to attract the most employees are ĂŽle-de-France (42,490), Auvergne-RhĂ´ne-Alpes (26,500), Nouvelle-Aquitaine (19,310) and Occitanie (17,470).

Yet the building sector struggles to recruit qualified tradespeople. The average share of recruitment difficulties stands at 72.7% nationally. Nouvelle-Aquitaine and Corsica are the regions where recruitment is hardest. Recruiters point to the insufficient number of candidates, often unsuitable profiles and working conditions (source). Some overseas départements (French Guiana, Guadeloupe and Réunion) rely on many seasonal workers to meet their needs quickly.

Below is the list of the most sought-after construction trades in France, according to the 2024 BMO survey. The figures in brackets are the number of recruitment plans:

  • Skilled bricklayers (20,010).
  • Plumbers and heating engineers (17,620).
  • Electricians (16,730).
  • Roofers (13,430).
  • Skilled construction joiners and fitters (12,570).
Diagram The most sought-after construction trades recruitment plans, France Travail BMO 2024 survey
Skilled bricklayers
20,010 projets
Plumbers and heating engineers
17,620 projets
Electricians
16,730 projets
Roofers
13,430 projets
Skilled joiners and fitters
12,570 projets

Other building trades are more in demand than others depending on the region. These include:

  • floor and wall covering installers;
  • painters and decorators;
  • concrete construction workers;
  • site managers and non-managerial site foremen;
  • façade, waterproofing and insulation workers;
  • carpenters (steel and timber).

23 ways to retain your construction employees

Are your construction tradespeople tempted to apply to a competitor or set up on their own? Discover 3 essential solutions to keep them with you and continue to showcase their precious know-how.

Make pay more attractive without hurting the company’s competitiveness

Several factors are squeezing construction companies’ finances. They have to cope with rising raw material prices, higher charges and repaying loans granted during Covid. Nevertheless, raising your employees’ pay is essential to keep your team stable.

Of course, this retention policy must not come at the expense of the company’s competitiveness. Balance your costs against a few perks employees appreciate: meal vouchers, holiday vouchers or gift vouchers. By managing your tradespeople’s timesheets in real time, you pay more fairly while saving time on admin.

👉 Discover Techtime’s features

Improve quality of working life

Employees are looking not only for good pay but also for a safe and fulfilling working environment. The French Labour Code requires you to apply health and safety measures such as:

  • providing personal protective equipment (PPE) against noise, dust, etc.;
  • organising occupational risk prevention measures and safety training (source).

Don’t hesitate to go beyond this legal framework to improve your staff’s comfort. Employees are increasingly demanding about work-life balance (source). So stay flexible on working time arrangements according to employees’ constraints or wishes (four-day week, part-time, etc.). The company Mu Fangzi, which specialises in timber-frame houses, spreads its 35-hour week over four days. Its manager, Pascal di Stephano, is pleased to note an “extremely low absenteeism rate”.

Pay attention to the performance and proper working order of your tools on site. Develop off-site work to protect your employees from bad weather. Optimise their journeys, as well as tracking of their working hours and statutory breaks.

👉 Take advantage of Techtime’s worksite scheduling

Invest in staff training or internal promotion

Career changes to other sectors and freelancing also contribute to labour shortages. In 2022, URSSAF counted 74,200 self-employed workers in structural works, 63,700 in installation work and 76,100 in finishing work, and these numbers keep growing (source).

Beyond job security, support your employees with active training on innovation in construction. New construction methods and technologies (BIM, lean management…) appeal to young apprentices. Internal promotions give experienced staff new responsibilities, with the pay and working comfort that go with them. Don’t neglect training at any level.

34 solutions to attract new candidates to the building trade

The construction recruitment crisis is linked to households’ difficulty getting credit to buy new-build homes. However, construction trades can bounce back thanks to technological innovation and opening jobs to a wider range of candidates. The French construction jobs observatory estimates that 120,000 jobs will be created by 2030 (source). How can they be filled quickly?

Diagram 4 solutions to attract new candidates
Promote

Restore the standing of building trades

Open up

Make construction jobs more accessible

Unite

Showcase your company culture

Innovate

Develop off-site construction

Restore the standing of building professions

Construction does not have a good image among younger generations or women. Physical strain, dangerous tasks and frequent travel are often cited as reasons to turn away from building. Yet these constraints are easing thanks to new technologies, not to mention the variety of construction trades. Don’t hesitate to showcase all these opportunities and your innovations in apprentice training centres (CFA).

Make construction jobs more accessible

Don’t limit your efforts to secondary schools or universities. Increase your visibility by attending trade shows or working actively on your social media. Publish job ads suited to a range of profiles, according to people’s backgrounds or level of experience. Contact your local France Travail agencies to obtain hiring subsidies depending on your candidates.

Like Maho Bâtiment in Brittany, consider offering tailored training to your apprentices. By giving them practical documents such as guides or prevention booklets, you give them peace of mind at work. Thanks to these efforts, the company’s HR director says that “thanks to word of mouth, [she has] no trouble at all finding apprentices” (source).

Showcase your company’s positive culture

Building a positive employer brand is one of your best levers for attracting new talent. Think you can only stand out with attractive salaries, flexible working time or new technologies? Younger generations pay attention to other factors too:

  • Promoting human values (inclusion, listening, transparency, etc.) and an environmental policy. Jean-Pascal Decroix, founder of STME, applies an equal relationship between apprentice and trainer on site. He finds that young people, feeling more “empowered”, get more involved in the “various projects to think about the company”.
  • Organising internal or external events to strengthen team cohesion.
  • Offering training to develop new skills.

Develop off-site construction through new technologies

Off-site construction relocates part of the manufacturing of modular or prefabricated buildings to a workshop or factory. New technologies (BIM, robotics) make this alternative possible.

Off-site construction has several advantages:

  • It makes it easier to manage worksite waste.
  • It is faster and cheaper in terms of transport and recycling of materials (source).
  • It can suit younger generations and women, as it allows them to work sheltered from bad weather.

Struggling to renew or retain your construction workforce? Listen to your employees, improving their pay or working time without sacrificing your company’s competitiveness. Invest wholeheartedly in training young people to revitalise the image of building through new technologies and more responsible values. Don’t hesitate to call on our experts in supporting business owners to meet all these new challenges.

Frequently asked questions

Which construction trades are most in demand?

According to France Travail’s 2024 BMO survey: skilled bricklayers (20,010 recruitment plans), plumbers and heating engineers (17,620), electricians (16,730), roofers (13,430) and skilled joiners and fitters (12,570).

Why does construction struggle to recruit?

Recruiters cite the insufficient number of candidates, often unsuitable profiles and working conditions. The sector also suffers from an unattractive image among young people and women, and some employees change careers or set up on their own.

How do you retain employees in construction?

By making pay more attractive without hurting competitiveness, improving quality of working life (protective equipment, work-life balance, optimised journeys) and investing in training and internal promotion.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes