Theft on your worksite: what steps should you take?

Techtime6 min read

Judge’s gavel in front of a person signing a document: steps after a worksite theft

Please note: this article refers to French regulations and standards.

Every year, worksite theft causes losses of more than €1 billion for French construction companies. This is equivalent to 1% of the sector’s total turnover (source). Losing tools or raw materials inevitably delays your worksites and creates tension in your teams. Loss of customer confidence can even lead to a shrinking order book. To avoid that, how should you go about reporting and then declaring theft on a worksite?

In brief

After a theft on a worksite, five steps are essential: file a complaint (by dialling 17, through an online pre-complaint or by letter to the public prosecutor), preserve the scene for the investigation, draw up an inventory of what was stolen using photos, invoices and registers, declare the loss to your insurer within 5 working days, and use the French Building Federation’s “Ras le vol” scheme.

Diagram Theft on the worksite: the 5 steps
  1. 1Complaintdial 17, online pre-complaint or the public prosecutor
  2. 2Preservationarea cordoned off for the investigation
  3. 3Inventoryphotos, invoices, registers
  4. 4Insurerclaim within 5 working days
  5. 5Ras le volthe FFB’s anti-theft scheme

1File a complaint with the police

As soon as you discover a theft on the worksite, alert the police immediately (police or gendarmerie depending on your area). To do so, simply dial 17. Once you have reported it, you file your complaint using one of two procedures.

The online pre-complaint procedure

A remote complaint via the internet lets you act quickly when an offence has been committed by an unknown perpetrator. This procedure is recommended for any offence against property, such as theft, damage or burglary (source).

On the pre-complaint website (mentioned in the source above), you select the département and town where the events took place. You fill in the online form with your identity, the circumstances and any information that may help investigators (witnesses, CCTV equipment, etc.). Once the declaration has been submitted, you get an appointment at your local police station or gendarmerie to confirm your complaint (source).

The “letter of complaint” to the public prosecutor

You can send a “letter of complaint” to the public prosecutor. The reasons may be as follows:

  • The offences have no major consequences for the company, with a ceiling of €3,000 for the damage caused.
  • The thefts keep recurring, but the project manager feels the situation is not being handled satisfactorily by the police (source).

You send your letter by recorded delivery with acknowledgement of receipt directly to the prosecutor or to the court registry. The prosecutor decides what action to take, from dropping the case to summoning the suspect directly before the court.

2Preserve the worksite for the criminal investigation

While waiting for the police to arrive, make sure you keep your worksite exactly as it was after the offence. Nobody should touch anything or move around carelessly. This matters for the forensic experts who will be sent to the scene, normally within 24 hours of your report.

Here are a few tips for managing your teams and your equipment fleet in such circumstances:

  • Cordon off the areas affected by the thieves to keep employees and unauthorised visitors out. Use the cones or safety barriers available on your project site.
  • If you need to pick up or handle an object, wear gloves so as not to leave your fingerprints. Make sure you mark where the item was before moving it.
  • If you need to move around in the area marked by the thieves, carefully note your route before retracing your steps exactly. Take care not to erase or damage any suspicious footprints in the mud.
  • Protect any footprints or tyre tracks from the weather with plastic sheeting pinned to the ground.

Step up surveillance of sensitive areas to prevent further thefts straight afterwards. Don’t hesitate to read our tips on ensuring safety on your worksite.

3List what was stolen: why registers matter

Before a visit from an expert appointed by the insurer, take care to photograph every detail of your worksite after the theft. Gather the invoices for the stolen items, as well as any relevant witness statements for the investigation.

Construction contractors must keep an inventory of their equipment, for both work equipment and personal protective equipment (PPE). The latter are part of the mandatory safety register, which includes the following information (source):

  • List of staff responsible for fire safety.
  • General evacuation instructions in the event of fire or other incidents.
  • Dates of the various equipment inspections and checks.
  • Etc.

Registers and inventories must be accessible and regularly updated when anything changes. Failing to keep a safety register, or keeping it poorly, is a 4th or even 5th class petty offence in France. It exposes you to a fine of €750 to €3,000 (Article 131-13, French Criminal Code) (source).

Worksite tracking software such as Techtime has the features you need to manage your equipment fleet and centralise your information. Don’t hesitate to discover our app tailored to your needs.

4Declare the worksite theft to your insurer

You have 5 working days to file an insurance claim with your insurer. To be covered against any risk of material theft, we recommend taking out contractors’ all-risks insurance (TRC).

This insurance is valid for the entire duration of the worksite, from opening to handover, provided you take it out no later than 60 days after the worksite opening date. The cost of effective TRC insurance is around 0.15% of the construction cost. Of course, nothing stops you adding cover depending on the level of risk on your worksite.

The project manager and the subcontractor are responsible for worksite surveillance and safety (Article 1792, French Civil Code). The former must hold structural damage insurance and check that every professional on the worksite is properly covered (source). The latter has an obligation of result towards the main contractor, hence the need to be insured as well (source).

By extension, they are also liable in the event of theft during the works. This applies to both public and private contracts. That is why TRC insurance is essential to compensate you for losses or disputes caused by the resulting delivery delays. However, the insurer assesses the circumstances of the claim and may refuse compensation if negligence is proven (source).

5Turn to the French Building Federation’s “Ras le vol” scheme

The French Building Federation (FFB) has offered the “Ras le vol” (fed up with theft) scheme since 2008. Member companies receive support to better secure their worksites during holiday periods. The process is run in partnership with the local public security directorates (DTSP), which report to the Ministry of the Interior.

Several tools assess worksite risks and determine the appropriate protection measures, as well as how to alert the authorities. The police forces involved in the scheme respond quickly as soon as an offence is reported (source).

As soon as you discover a theft on a worksite, cordon off the area and alert the police immediately to file a complaint. Take every precaution so that forensic experts can recover and analyse evidence at the scene. Then declare the theft to your insurer, hoping you have taken out contractors’ all-risks (TRC) insurance beforehand.

Want to know which raw materials or tools are stolen most? Want to take the best measures to protect your project? Discover the practical ways to prevent theft on your worksites.

Frequently asked questions

What should you do after a theft on a worksite?

Alert the police immediately to file a complaint, cordon off the area to preserve evidence, photograph the scene and draw up an inventory of the stolen equipment, then declare the theft to your insurer.

How long do you have to declare a theft to your insurer?

You have 5 working days to file an insurance claim with your insurer.

What is the “Ras le vol” scheme?

A scheme offered since 2008 by the French Building Federation to its members: it includes support and tools to assess the risk of theft on worksites and choose appropriate protection measures.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes