Advice

What are the forecasts for the construction industry in 2025?

Techtime8 min read

Hard hats lined up in front of cranes against a blue sky

Please note: this article refers to French regulations and standards.

2025 could be a decisive year for the construction industry. Construction companies are pressing on with technological innovation to respond to the climate emergency as much as to the need to make worksites profitable. However, building professionals are also facing economic difficulties caused by political and climatic conditions. New-build construction seems to be in decline, while the price of construction and renovation materials keeps rising. Many building companies find themselves under threat. Let’s take stock of the trends in the construction industry in 2025, and of the solutions put forward by the French Building Federation (FFB) to overcome these difficulties.

In brief

In 2025, the construction industry continues its transformation around four innovations: BIM and 3D printing boosted by artificial intelligence, green building and new materials, smart cities, and electric, safer construction machinery. On the economic side, the fall in new-build housing starts threatens jobs, while wages are rising, renovation is growing only modestly and material prices remain under pressure. The FFB is proposing several recovery measures, including the reinstatement of the universal zero-interest loan (PTZ).

1Forecasts for the 4 major technological innovations in construction

The construction industry is continuing its technological transformation and could even speed it up in 2025. The emergence of artificial intelligence in BIM and 3D printing helps reduce construction project costs. The development of green buildings and smart cities addresses environmental challenges by focusing on sustainable, connected environments. Finally, electric construction machinery aims to improve safety on the worksite while reducing the carbon footprint.

Diagram The 4 major innovations expected in 2025
BIM and 3D printing

With artificial intelligence

Green building

Recycled and new materials

Smart cities

Connected, energy-efficient cities

Next-generation machinery

Electric and safer

BIM and 3D printing in the age of artificial intelligence

The development of BIM (Building Information Modelling) and 3D printing in construction continues, for ever more profitable and efficient worksites. The projections for these technologies in 2025 are as follows:

  • 21 billion dollars for the BIM software market, according to Cambashi (source).
  • 7 billion dollars for the 3D printing market, according to IDTechEx (source).
Diagram The markets expected in 2025 billion dollars (Cambashi, IDTechEx)
BIM software
21 $bn
3D printing
7 $bn

The share of European architects using BIM for their construction projects is expected to reach 61% by 2025 (source). They appreciate the software’s cloud, which enables collaboration between project stakeholders as well as real-time updates. Digital twins and the Internet of Things (IoT) are designed to improve product design as well as building performance.

As for 3D printers, they adapt to the type of building. Some models, such as COBOD or ICON, can build large-scale or modular structures. Others, such as MudBots, are more mobile and meet emergency needs (prefabricated buildings). Computer-aided design (CAD) software makes it possible to link BIM software with a 3D printer (source).

Both technologies share the same trend: the integration of artificial intelligence (AI) to automate processes. Thanks to real-time data management, construction professionals can reap the following benefits:

Want to know how BIM software works? Read our article.

New construction materials for green building

The World Green Building Council assesses the construction sector’s share of global primary energy consumption. It stood at 35% in 2021, and the organisation forecasts that it will double by 2060 if nothing is done (source). Among the solutions to combat global warming, sustainable architecture is expected to cut CO2 emissions by 84 gigatonnes by 2025 (source).

To build green buildings while responding to the raw materials crisis, builders can opt for recycled materials: wood, PVC, glass, cellulose, carpets… and concrete too. In fact, 80% of its composition is made up of rubble, which can come from old buildings (source). Some sensitive metals, such as steel and aluminium, can also be recycled from one worksite to the next.

Other construction materials are starting to emerge, such as cross-laminated timber, graphene, aerogel and smart glass. In addition to their insulating properties, these new materials offer excellent strength (source).

The benefits of green building are as follows:

  • More effective insulation, reducing energy consumption.
  • A drastic reduction in environmental impact linked to the extraction, production and transport of raw materials.
  • The integration of sustainable technologies such as solar, wind or rainwater-harvesting systems (source).

Savings on the eco-contribution for construction companies.

Smart cities: smarter, more energy-efficient cities

Beyond green buildings, entire cities are going green. The Observatoire de la vie connectée estimates that the smart cities market should reach 3,651 billion dollars by 2025, compared with 773 billion dollars in 2016 (source).

Smart cities are defined as hyper-connected spaces designed to improve city management. Smart traffic sensors, wifi-connected lighting… artificial intelligence keeps the city flowing while helping it achieve energy savings. Some cities in France and elsewhere in Europe have already taken the plunge: Paris, Lyon and the Scandinavian capitals. The first 100 European Smart Cities should be up and running by 2030 (source).

Next-generation construction machinery: electric and safe

At the Intermat 2024 trade show, construction professionals discovered eco-friendly construction machinery with built-in safety features (source). The following vehicles were on show:

  • An all-electric RSP suction excavator, fitted with 2 batteries for 6 hours of autonomy.
  • An electric, remote-controlled Putzmeister concrete mixer truck that limits noise on the worksite.
  • A Renault Trucks E-Tech truck with an unbreakable steel bumper, designed for steep slopes.

These machines feature cutting-edge technologies to avoid collisions with pedestrians. Artificial intelligence oversees detection systems (on-board cameras, radars) and emergency braking assistance. Despite limited battery life and high purchase prices, electric machines seem to be winning through unreservedly. According to the UnivDatos report, the global market for electric construction equipment is expected to grow by 14.72% by 2030 (source).

Before going any further, we invite you to read our recommendations to better manage your equipment fleet through digitalisation.

Despite these major technological innovations, the raw materials and energy crises will continue to weigh on construction projects. Shrinking household purchasing power and tighter conditions for obtaining a mortgage are putting the new-build market under severe strain. In the long run, this could threaten several thousand jobs. Which is the better option: building a new building or renovating an old one?

Falling new-build housing starts: a danger for employment?

FFB president Olivier Salleron notes the fall in new-build housing starts. The federation’s report forecasts 274,000 individual or multi-unit homes started in 2025, a 25% drop in new housing since 2022 (source). New non-residential buildings are no exception, with projects down 6.2% (source).

Construction companies are trying to withstand the decline in building permits. Even though the FFB expects 150,000 job cuts in 2025 (source), Mr Salleron points to three factors that could offset this trend.

  • Easing inflation on building materials.
  • Falling mortgage interest rates, below 3%.
  • Households’ plans to embark on property projects.

Find out how to recruit effectively in construction.

Forecasts for construction wages in 2025

To offset the risk of job cuts, wages in the construction sector have been rising since 2023. Forecasts point to wage growth stabilising at around 3.5% for 2025 (source). Increases are expected to be larger in green construction and smart technologies.

The reasons for these pay rises are as follows:

  • The shortage of skilled labour.
  • The desire to maintain employees’ purchasing power in the face of inflation.
  • Public and private investment.
  • Technological innovation.

Modest growth in building renovation and maintenance

Rather than constructing new buildings, construction companies prefer to focus on renovation or the maintenance of existing buildings. The FFB is banking on average growth of 2% a year by 2025 (source).

According to Olivier Salleron, the 2024 reforms of the MaPrimeRénov’ scheme are making renovation work more complicated. The split into two pathways, the requirements regarding the Energy Performance Certificate (DPE) and the new eligibility conditions have made processing applications more complex. Not to mention the 2.5-billion-euro cut in the budget for this energy renovation grant (source). Nevertheless, these reforms aim to deliver more ambitious and effective projects in the long term, in order to reach carbon neutrality by 2050 (source).

Find out how to improve the energy renovation of your building with tailor-made software.

Soaring material prices caused by the energy crisis

Conflicts and climate crises will continue to weigh heavily on building material prices in 2025. Inflation will be particularly marked for kiln-fired products (flat glass, terracotta, ceramics, cement) and ready-mixed concrete. Market fluctuations, energy prices and transport costs will drive these price increases.

That is why it will be better to turn to new eco-friendly or sustainable materials, in order to comply with the RE2020 environmental regulation. Materials recycled close to you will reduce your transport and production costs, while putting worksite waste to good use.

Read our advice to better manage construction costs in times of inflation.

3The solutions put forward by the French Building Federation

To close its press conference, the FFB put forward the following measures to the new government to revive the construction sector (source). These ten proposals would form part of the finance bill (PLF) for 2025:

  • Reinstating the universal zero-interest loan (PTZ).
  • Keeping the Pinel scheme for new homes.
  • Stabilising MaPrimeRĂ©nov’.
  • Postponing the RE2020 environmental regulation (source).
  • Reopening the ZAN (net zero land take) file (source).
  • Limiting cascading subcontracting.
  • Revising the VAT exemption threshold.
  • Reforming the REP Bâtiment scheme (extended producer responsibility) for waste management (with treatment and recovery of waste covered for companies).
  • Supporting apprenticeships.
  • Regulating employer representation in social dialogue.

Artificial intelligence built into BIM and 3D printing allows construction entrepreneurs to deliver high-quality worksites. The trend for the years ahead is to build ever greener, more connected cities to improve residents’ well-being. These efforts to fight global warming are running up against the realities of material and energy inflation. Nevertheless, the FFB intends to include its proposals in the 2025 finance bill so as not to put construction entrepreneurs at risk. With our Techtime tracking software, we are ready to support you on your worksites of the future.

Frequently asked questions

What are the major innovations expected in construction in 2025?

BIM and 3D printing combined with artificial intelligence, new green building materials, smart cities, and electric, safer construction machinery.

How big are the BIM and 3D printing markets?

According to Cambashi, the BIM software market is expected to reach 21 billion dollars, and according to IDTechEx the 3D printing market 7 billion dollars.

What measures is the FFB proposing to revive construction?

Reinstating the universal zero-interest loan (PTZ), keeping the Pinel scheme for new homes, stabilising MaPrimeRénov’, postponing RE2020, reopening the ZAN file and limiting cascading subcontracting.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes