Advice

Choosing the right workwear for construction

Techtime7 min read

Figure made of tools and protective equipment: hard hat, gloves and construction workwear

The media outlet Batiweb “counts an average of 48 accidents per 1,000 people” on construction sites in France in 2024. Although this figure remains dramatic, it appears to be falling compared with 2022, when 78 fatal accidents were recorded. Among protective measures for construction tradespeople, clothing remains a key factor in avoiding minor or serious injuries. Here are our recommendations for choosing construction workwear to suit your trade.

In brief

On a worksite, workwear is personal protective equipment (PPE), classified into three categories according to the risk: minor, intermediate, or fatal and irreversible. It protects against falls, electricity, impacts, chemicals, cold and bad weather, and must meet specific standards: EN ISO 13688 for general requirements, EN ISO 20471 for high visibility, EN 343 for bad weather… A complete outfit combines a top, trousers or overalls, safety footwear and accessories (hard hat, gloves, glasses, fall protection).

1Why wear protective clothing on a worksite?

Construction workers face many risks in the field. The CARSAT Alsace-Moselle (French regional occupational health insurance fund) sets out the following classification in its occupational risk assessment guide:

  • Risks of falls from height (including from scaffolding) or on the same level. The former concern trades such as carpenters or roofers. The latter occur on poor floors, in confined spaces or when carrying heavy objects (Assurance Maladie). Tilers are particularly exposed to the dangers of wet floors.
  • Electrical risks, such as arc flashes or electrostatic discharges. Although this can happen to any construction professional, the risk mainly concerns electricians.
  • Risks of traffic accidents between people or with construction machinery, due to poor visibility. Care is also needed with mechanical or manual handling. Some professionals work for hours in uncomfortable positions, not to mention the risks of cuts or being caught in rotating machinery.
  • Risks of falling objects or building elements toppling over due to bad weather.
  • Chemical risks when workers handle hazardous materials (asbestos, lead, glues, resins, etc.). Biological risks are also taken into account.
  • Physiological risks, such as burns from contact with hot materials (bituminous products) or noise that can deafen unprotected workers.

2What are the regulations on construction workwear?

Worksite clothing is considered personal protective equipment (PPE). As a result, depending on the trade or working conditions, it must meet French (NF), European (EN) or international (ISO) standards. After passing conformity tests and obtaining an EU type-examination certificate (under Regulation (EU) 2016/425), products are classified into three categories (FIP Center):

  • Category 1 for minor risks, such as superficial injuries, contact with mildly harmful products or temperatures below 50°C.
  • Category 2 for intermediate mechanical, chemical or thermal risks.
  • Category 3 for fatal or irreversible risks, such as electric shocks, falls from height, ionising radiation or temperatures above 100°C.

This classification corresponds to Annex I of Regulation (EU) 2016/425 of the European Parliament and of the Council of 9 March 2016 on PPE, which repealed the former Council Directive 89/686/EEC of 21 December 1989. In France, the conditions of use for PPE, periodic checks and worker training are set out in Articles R4323-91 to R4323-106 of the French Labour Code.

Diagram The 3 PPE categories under Regulation (EU) 2016/425
  1. Category 3Fatal or irreversible risks

    Electric shocks, falls from height, ionising radiation, over 100 °C

  2. Category 2Intermediate risks

    Mechanical, chemical or thermal risks

  3. Category 1Minor risks

    Superficial injuries, mildly harmful products, temperatures below 50 °C

3How do you choose construction workwear for your trade or site?

There are many suppliers of construction workwear. To help you find your way around their online shops, here are some tips on the different parts of your kit. Whatever type of clothing you choose from those presented below, make sure it meets the following standards (FIP Center):

  • EN ISO 13688 (formerly EN 340) covers general requirements for user safety.
  • EN 342 guarantees protection against cold (temperatures below −5°C).
  • EN 343 protects against bad weather (rain, wind, cold)
  • EN ISO 20471 (formerly EN 471) covers high-visibility clothing.
  • EN 11612 refers to fire protection or flame retardancy.
  • EN 1149 covers protection against static electricity.

Upper body: comfort, waterproofing and visibility

Depending on the weather, you can choose between different garments for the upper body: T-shirt, polo shirt or sweatshirt. These tops are made entirely of cotton or a cotton/polyester blend. These light, breathable fabrics wick away sweat and preserve your freedom of movement.

Short-sleeved T-shirts or polo shirts may be tolerated in hot weather or for indoor work (such as tilers). However, check with your site manager about the risks on your worksite. If they are very likely, be careful and wear a vest or a work jacket.

These outer layers are made of synthetic materials (polyester, spandex or nylon) to be waterproof and resistant to wear, heat and stains. Their high collar protects your neck from splashes or flying debris. Their many pockets are useful for sorting and storing your tools and equipment.

A vest or jacket keeps you warm in bad weather if you work outdoors. You may also have to work at night, either because it is winter or because you are doing overtime. In that case, you must wear high-visibility vests and high-visibility trousers. Drivers and pedestrians must be able to spot you from a distance thanks to the bright, fluorescent colours of your clothing and their reflective strips. You can also wear them in broad daylight, as their UV protection can block up to 98% of UV rays (UPF 40+ rating).

Lower body: protecting against cuts and grazes

Work trousers are made of cotton for comfort and lightness, with a small percentage of spandex (or elastane). This synthetic material adds stretch and wear resistance, very useful for professionals who work in uncomfortable positions. It also makes stains easier to remove.

The properties of spandex protect the construction tradesperson against cuts and other injuries caused by dangerous tools. More generally, reinforced protection can be added in line with the following standards (Prévention BTP):

  • NF EN ISO 14877: protection against abrasive blasting (such as sand)
  • NF EN 381: protection when using chainsaws (reinforced with Kevlar). This particularly concerns landscapers and gardeners.
  • NF EN 510: protection against the risk of being caught in a machine.
  • EN 14404: protection against prolonged kneeling (tiler, roofer, plumber, etc.). Some technologies, such as Cordura or Hygrovet, allow trousers to meet this standard.

Bib overalls and coveralls

Some professionals, such as plumbers, bricklayers or joiners, prefer an outfit that covers and protects all or part of the body. This may be bib overalls or a boiler suit. Both types of garment have many pockets with various uses.

Bib overalls allow great freedom of movement, as they leave the shoulders and arms free. They fit the wearer perfectly thanks to adjustable buttons. Several extra features improve their quality, such as knee pads, triple stitching or the patch pocket on the bib.

A boiler suit can be put on and taken off quickly if there is a problem. Different colours help identify different trades (blue for electricians, grey for plumbers). Back gussets add comfort and freedom of movement, along with adjustable cuffs. It is especially recommended for full protection against certain agents, such as germs, chemicals or dirt.

Safety footwear to complete your protection

Safety footwear protects the feet against various injuries: penetration by foreign bodies, cuts, falling heavy objects, slipping, etc. Its leather is robust, waterproof (or water-repellent) and smart. Puncture-resistant and non-slip soles are among the safety features of this footwear.

Depending on your work, you can choose from three types of footwear, each meeting specific standards:

  • Low shoes (S1 and S1P) are light and flexible enough for uncomfortable positions such as crouching or kneeling. Their antistatic soles and padded sections protect you from sharp objects and oily liquids. The soles are also breathable to prevent sweaty feet. They suit indoor tradespeople such as painters or electricians.
  • High boots (S2 or S3) support your ankles when walking on wet ground. They must be fully waterproof. They are for construction workers working outdoors, such as landscapers, carpenters or plumbers.
  • Safety wellingtons (S4 or S5) are made of steel, composite, woven or specialist materials (Tufftech or Chemtech). They are essential against punctures and electric shocks. They resist both wear and heat.
Diagram Which safety footwear should you choose?
Low · S1 and S1P

Light and flexible, for crouching or kneeling

High · S2 or S3

Ankle support and waterproofing, for outdoor work

Boots · S4 or S5

Against punctures and electric shocks

Other personal protective accessories

To complete your protection, it is important to have the following accessories, which are also PPE (Carlstahl):

  • Safety helmet (EN 397) or hearing protection (earplugs, earmuffs) (EN 352), to protect you from worksite noise.
  • Protective gloves (EN 420, 388 or 511), in leather or synthetic material.
  • Safety glasses or visor (EN 166, 169 or 170), in tough polycarbonate with anti-fog and anti-scratch treatment.
  • Fall protection (EN 341, 353, etc.) such as safety harnesses, anchor points, work positioning belts, etc.
  • Respirators (EN 136, 140, 141, 143) against worksite dust, toxic gases or chemical vapours.

4Conclusion

Construction workwear meets very strict French and European standards to protect against cuts and burns. Each construction trade can choose garments to suit its working conditions, provided wearing them poses no risk. So that your teams can anticipate what to wear on their next worksite, keep your information up to date and share it through your worksite tracking app.

Frequently asked questions

Is worksite clothing PPE?

Yes. Depending on the trade and working conditions, it is classified as category 1 (minor risks), 2 (intermediate risks) or 3 (fatal or irreversible risks), in accordance with European Regulation 2016/425 on PPE.

Which standards apply to construction workwear?

In particular EN ISO 13688 for general requirements, EN 342 against cold, EN 343 against bad weather, EN ISO 20471 for high visibility, EN 11612 for flame protection and EN 1149 against static electricity.

Which safety footwear should you choose?

Low shoes (S1, S1P), light and flexible for crouching; high boots (S2, S3) for ankle support and waterproofing outdoors; safety wellingtons (S4, S5) against punctures and electric shocks.

Free trial

Sign up in under 47 seconds

No commitment, and you gain your superpowers: 14 days to try Techtime with your teams.

Yes, I’m flying: sign me up
Illustration: three people in superhero capes on a building under construction, between two cranes